APERC · Andhra Pradesh Electricity Regulatory Commission
Electricity Supply Code Regulation, 2004 — Fourth Amendment, 2025 — Statement of Reasons
Fourth Amendment to Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No. 5 of 2004)
Statement of reasonsDated 24 Feb 2025Regulation No.2 of 2025 dated 24 .02.2025
The commission's reasons for the Electricity Supply Code Regulation, 2004 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APERC's statement of reasons for the Fourth Amendment to the Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No. 5 of 2004), issued as Regulation No. 2 of 2025 and dated 24-02-2025 (p1, p24). Pages 1–21 record how the Commission disposed of the 32 comments received on the draft; Annexure-I (pp22–23) lists the objectors and Annexure-II (pp24–27) reproduces the final amended text.
The trigger is the CEA (Installation and Operation of Meters) Amendment Regulations of 2019 and 2022, which push smart prepaid metering, together with Ministry of Power timelines of 17.08.2021 (p1–2). The APDISCOMs asked for consequential changes to the Supply Code and the GTCS (p2). A common public notice on 01.01.2025 set a 22.01.2025 deadline, extended on 21.01.2025 to 29.01.2025 (p2).
Five amendments are analysed item by item: an e-wallet mechanism appended to clause 3.3 (p3–5); a new clause 4.1.6 replacing physical bills with e-bills for smart meters (p5–8); a new clause 4.3.10 governing the first recharge, subsequent recharge denominations and recovery of short-billed amounts (p8–13); a new clause 4.8.4 on emergency credit, graded low-balance alerts and the disconnection sequence (p13–17); and an addition to clause 5 on recharge posting, automatic reconnection and complaint resolution timelines (p17–18). General objections — website publication, consolidation of metering rules, arrears, subsidy pass-through, monitoring — are answered at p18–21, where the Commission decides to handle procedural matters through separate guidelines to DISCOMs rather than in the Regulations (p21).
Annexure-II gives the operative text: short title, extent to Andhra Pradesh, commencement on Gazette publication, and seven amending clauses, including a clause 4.2 addition giving consumers bill information in English or Telugu (p24–27).
Read with this
The regulation
- Dated 17 Mar 2004Electricity Supply Code Regulation, 2004
Amendments and corrections
- Dated 5 Aug 2013Electricity Supply Code, 2004 — Second Amendment, 2013
- Dated 13 Feb 2019Third Amendment to the Electricity Supply Code, 2019
- Date not statedElectricity Supply Code (First Amendment) Regulation, 2006
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2025Electricity Supply Code, 2004 — Fourth Amendment, 2025
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.