Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Electricity Supply Code Regulation, 2004 — Fourth Amendment, 2025 — Statement of Reasons

Fourth Amendment to Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No. 5 of 2004)

Statement of reasonsDated 24 Feb 2025Regulation No.2 of 2025 dated 24 .02.2025

The commission's reasons for the Electricity Supply Code Regulation, 2004 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's statement of reasons for the Fourth Amendment to the Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No. 5 of 2004), issued as Regulation No. 2 of 2025 and dated 24-02-2025 (p1, p24). Pages 1–21 record how the Commission disposed of the 32 comments received on the draft; Annexure-I (pp22–23) lists the objectors and Annexure-II (pp24–27) reproduces the final amended text.

The trigger is the CEA (Installation and Operation of Meters) Amendment Regulations of 2019 and 2022, which push smart prepaid metering, together with Ministry of Power timelines of 17.08.2021 (p1–2). The APDISCOMs asked for consequential changes to the Supply Code and the GTCS (p2). A common public notice on 01.01.2025 set a 22.01.2025 deadline, extended on 21.01.2025 to 29.01.2025 (p2).

Five amendments are analysed item by item: an e-wallet mechanism appended to clause 3.3 (p3–5); a new clause 4.1.6 replacing physical bills with e-bills for smart meters (p5–8); a new clause 4.3.10 governing the first recharge, subsequent recharge denominations and recovery of short-billed amounts (p8–13); a new clause 4.8.4 on emergency credit, graded low-balance alerts and the disconnection sequence (p13–17); and an addition to clause 5 on recharge posting, automatic reconnection and complaint resolution timelines (p17–18). General objections — website publication, consolidation of metering rules, arrears, subsidy pass-through, monitoring — are answered at p18–21, where the Commission decides to handle procedural matters through separate guidelines to DISCOMs rather than in the Regulations (p21).

Annexure-II gives the operative text: short title, extent to Andhra Pradesh, commencement on Gazette publication, and seven amending clauses, including a clause 4.2 addition giving consumers bill information in English or Telugu (p24–27).

Standard name
Electricity Supply Code
Primary topics
Metering, Billing and payment, New connections and load changes

Read with this

The regulation

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document