Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Electricity Supply Code, 2004 — Second Amendment, 2013

Andhra Pradesh Electricity Regulatory Commission (Electricity Supply code) Second Amendment Regulation, 2013

AmendmentDated 5 Aug 2013Regulation No.7 of 2013 dated 05.08.2013

Amends the Electricity Supply Code Regulation, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to the APERC Electricity Supply Code Regulation, 2004. The introduction (p1) recalls that s.50 of the Electricity Act 2003 requires the State Commission to specify a Supply Code covering recovery of charges, billing intervals, disconnection and restoration, prevention of tampering, and licensees' entry rights, and traces the 2004 Code and its 2006 first amendment. The Commission then reviewed the Code, issued a draft amendment, hosted it for comments and held a public hearing on 17-06-2013 before framing this amendment (p1).

The Regulation applies to all Distribution Licensees in their respective licensed areas in Andhra Pradesh and comes into force on the date of its publication in the Andhra Pradesh Gazette (p2); the Gazette date is not printed on the copy, though the order is signed at Hyderabad on 05.08.2013 (p4).

The operative part amends ten clauses of the 2004 Code. It substitutes the definition of 'Consumption Charges' to bring in demand/fixed charges, Fuel Surcharge Adjustment and customer charges (p2); adds 'Security Deposit' to the particulars listed in cl.4.2(d); rewrites cl.4.2(m) to require the bill to carry the date of the bill, the due date of payment and the due date of disconnection (p2); replaces 'Surcharge for low power factor' with 'Meter rent' in cl.4.2(n)(7) (p2); and revises the payment clauses 4.3.5(i)–(iii), including the cash-payment ceiling and the accepted modes of payment (p2–3), with cheque presentation a stated number of working days before the due date (p3).

Clause 9 rewrites cl.4.6.1 on grant of instalments for arrears, capping the number of instalments, prescribing an interest rate on the instalment amount and barring additional delayed-payment charges on it (p3). Clause 10 substitutes cl.4.8.1 on disconnection for non-payment: notice period, dispensing with a separate disconnection notice where the disconnection date is printed on the bill, the licensee's power to disconnect the consumer's other, separately-agreed services, and a carve-out protecting other services of agricultural consumers who default on customer charges (p3–4).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Billing and payment, Late payment surcharge and rebate

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document