Electricity Supply Code, 2004 — Fourth Amendment, 2025

Fourth Amendment to Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No 5 of 2004)

Draft amendmentDated 1 Jan 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Commission amends its Electricity Supply Code, 2004 to write a prepaid smart-metering framework into the General Terms and Conditions of Supply. The recitals (p1–2) trace the principal regulation's amendment history, note that the post-bifurcation APERC adopted it in 2014, and set out the trigger: the CEA's 2019 and 2022 amendments to the Meter Regulations requiring prepaid smart meters, and the Ministry of Power notification of 17.08.2021 fixing replacement timelines; APDISCOMs asked for conforming changes. Clause 1 (p2) gives the short title, extends the amendment to the whole State and brings it into force on Gazette publication.

Clause 2 (p2) inserts an e-wallet settlement mechanism at the end of the supply conditions — an e-wallet created and linked to the connection, recharged periodically against the applicable tariff through portals, apps, retailers and kiosks. Clause 3 (p3) inserts a smart-meter billing clause: no physical bills, e-bills instead by app, SMS, WhatsApp or DISCOM portal in English and Telugu, with consumers able to update mobile numbers. Clause 4 (p3) requires bill information in English or Telugu on request.

Clause 5 (p3) adds the first-recharge and subsequent-recharge rules for prepaid/smart meters — what the first recharge must cover, a floor and denomination for later recharges, no ceiling, and deduction of pre-installation arrears. Clause 6 (p3–4) sets the disconnection regime: emergency credit, three advance low-balance alerts, restricted disconnection windows, post-disconnection notification, permanent disconnection after a set period, meter removal and e-wallet deactivation, and the route back to a new connection. Clause 7 (p4) fixes service levels for recharge posting, automatic reconnection and complaint resolution.

Standard name
Electricity Supply Code
Primary topics
Metering, Billing and payment, Conditions of supply

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗