APERC · Andhra Pradesh Electricity Regulatory Commission
Electricity Supply Code, 2004 — Fourth Amendment, 2025
Fourth Amendment to Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No 5 of 2004)
Draft amendmentDated 1 Jan 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission amends its Electricity Supply Code, 2004 to write a prepaid smart-metering framework into the General Terms and Conditions of Supply. The recitals (p1–2) trace the principal regulation's amendment history, note that the post-bifurcation APERC adopted it in 2014, and set out the trigger: the CEA's 2019 and 2022 amendments to the Meter Regulations requiring prepaid smart meters, and the Ministry of Power notification of 17.08.2021 fixing replacement timelines; APDISCOMs asked for conforming changes. Clause 1 (p2) gives the short title, extends the amendment to the whole State and brings it into force on Gazette publication.
Clause 2 (p2) inserts an e-wallet settlement mechanism at the end of the supply conditions — an e-wallet created and linked to the connection, recharged periodically against the applicable tariff through portals, apps, retailers and kiosks. Clause 3 (p3) inserts a smart-meter billing clause: no physical bills, e-bills instead by app, SMS, WhatsApp or DISCOM portal in English and Telugu, with consumers able to update mobile numbers. Clause 4 (p3) requires bill information in English or Telugu on request.
Clause 5 (p3) adds the first-recharge and subsequent-recharge rules for prepaid/smart meters — what the first recharge must cover, a floor and denomination for later recharges, no ceiling, and deduction of pre-installation arrears. Clause 6 (p3–4) sets the disconnection regime: emergency credit, three advance low-balance alerts, restricted disconnection windows, post-disconnection notification, permanent disconnection after a set period, meter removal and e-wallet deactivation, and the route back to a new connection. Clause 7 (p4) fixes service levels for recharge posting, automatic reconnection and complaint resolution.
Read with this
The regulation
- Dated 17 Mar 2004Electricity Supply Code Regulation, 2004
Amendments and corrections
- Dated 5 Aug 2013Electricity Supply Code, 2004 — Second Amendment, 2013
- Dated 13 Feb 2019Third Amendment to the Electricity Supply Code, 2019
- Date not statedElectricity Supply Code (First Amendment) Regulation, 2006
Commencement notices and reasons
Consolidated copies, for reference (1)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.