Skip to content

TERC · Tripura Electricity Regulatory Commission

Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering Regulations, 2024 — First Amendment, 2025 — Draft

TERC (The Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, (First Amendment), 2025

Explanatory memorandum to a draftDated 30 Oct 2025No.F.25/TERC/2025/979 dated 30th October, 2025

Explanatory memorandum to a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft first amendment to the Tripura Electricity Regulatory Commission's 2024 regulations on grid-interactive solar rooftop photovoltaic systems under gross and net metering (p1). The Commission records that it received a representation from the Tripura Renewable Energy Development Agency seeking clarification and review of Regulations 5.3, 5.4 and 16.5, and has decided to amend the relevant provisions (p1). It is made under section 181(1) read with sections 30, 39, 40, 42 and 86 of the Electricity Act, 2003 (p1).

Regulation 1 gives the short title, provides that the amendment takes effect from publication in the Tripura Gazette, and applies throughout Tripura (p1). Regulation 2 substitutes Regulation 5.3, replacing the table of capacities permissible under individual net metering, multiple points of connection, group net metering and gross metering (p1). Regulation 3 substitutes Regulation 5.4, replacing the table that maps voltage level (LT, HT, EHT) and phase to the permissible capacity band for a grid-interactive SRTPVS (p2). Regulation 4 amends Regulation 16.1 to place energy settlement and billing on a quarterly basis (p2).

Regulation 5 rewrites the first proviso to Regulation 16.5. The substituted text sets the direction of payment between prosumer and DISCOM depending on whether import exceeds export or vice versa, and separates domestic, irrigation-through-solar and water-works-through-solar consumers from all other categories. For the former, excess injection above a 100-unit threshold is paid quarterly at feed-in tariff subject to a daily generation cap per kW of installed capacity, and net energy credits below that threshold are carried into the next billing period; for the latter, the same cap applies but surplus left at the end of the billing period lapses with no payment (pp2–3). The amendment is issued by order of the Commission (p3).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Billing and payment

Read with this

Voltaic does not hold the regulation itself.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document