TERC · Tripura Electricity Regulatory Commission
Grid Interactive Solar Rooftop PV System under Gross/Net Metering Regulations, 2024 — Second Amendment, 2026 — Draft
TERC (The Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, (Second Amendment), 2026
Draft amendmentDated 16 Oct 2026No.F.25/TERC/2025/1026 dated 16th October 2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A draft second amendment to the TERC Grid-Interactive Solar Rooftop Photovoltaic Regulations, 2024 — the principal regulations notified in the Tripura Gazette on 5 July 2024 and already amended once on 18 December 2025 (p1). It is issued on 16 October 2026 and takes effect on publication in the Tripura Gazette; the gazette date is not printed (p1). It responds to representations from TREDA and TSECL and is expressed as substituted text for eight provisions of the principal regulations.
Sections 2–4 reset the eligibility and interconnection rules. The revised Reg 5.3 sets the minimum and maximum capacity available under individual net metering, multiple points of a group, group net metering and gross metering, capped at the consumer's contracted load/demand and read as inverter AC capacity (p1–2). The revised Reg 5.4 maps permissible capacity bands to voltage level and phase (p2). The revised Reg 5.5 caps what may be connected to a distribution transformer or feeder and obliges the consumer to upgrade transformer capacity where contracted demand is below the effective solar plant capacity (p3).
Section 5 restates the feed-in tariff as a share of the Average Cost of Supply of the financial year of commissioning, differentiated across three consumer categories (p3). Section 6 rewrites the technical feasibility process — first-come-first-served approval, deficiency particulars in Annexure VI, cost estimates for deficiency removal and augmentation — and requires the distribution licensee to fund service line-cum-development and network augmentation capex for government renewable energy establishments, passed through ARR subject to prudence check (p3). Sections 7–9 deal with money and surplus energy: bank details and electronic transfer for prosumers and Project Implementing Agencies (p4); monthly settlement of net import and quarterly payment for excess export, with daily generation capping per kW, carry-forward of credits below the stated unit threshold, and lapse of surplus for other categories (p4–5); and a new clause 16.8 creating Virtual Net Metering, with gross-metered export allocated by agreement among participating consumers and unused allocation lapsing (p5).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Explanatory memorandum: Grid Interactive Solar Rooftop PV Gross/Net Metering Regulations, 2024 — First Amendment, 2025 — Explanatory Memorandum — Draft
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.