Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering Regulation, 2024 — First Amendment, 2025

TERC (The Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2024, (First Amendment), 2025

AmendmentDated 18 Dec 2025Published in the Gazette 22 Dec 2025

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Tripura Electricity Regulatory Commission's First Amendment to its 2024 regulation on grid-interactive solar rooftop photovoltaic systems under gross and net metering. It was issued on 18 December 2025 under notification No.F.25/TERC/2025/1272 and published in the Extraordinary issue of the Tripura Gazette dated 22 December 2025, from which date it comes into force (p1). The Commission states it was moved by a representation from the Tripura Renewable Energy Development Agency asking for clarification and review of Regulations 5.3, 5.4 and 16.5 of the principal regulation (p1).

The amendment rewrites six provisions. Clause 2 replaces the capacity table in Regulation 5.3, setting minimum and maximum sizes for individual net metering, net metering at multiple points of one individual, group net metering and gross metering, with the upper end capped by the consumer's contracted load or contracted demand (p1–2). Clause 3 replaces Regulation 5.4 with a voltage-wise table mapping permissible capacity to LT single-phase and three-phase, HT 11 kV and 33 kV, and EHT 132 kV and above connections (p2). Clause 4 sets the feed-in tariff as a percentage of the Commission-determined Average Cost of Supply of the year of commissioning — 35 per cent for domestic consumers and 17 per cent for irrigation-through-solar and water-works-through-solar categories (p2). Clause 5 revises the application fee schedule across capacity slabs (p3). Clause 6 replaces Regulation 16.5, governing monthly and quarterly settlement of net energy, a 100-unit carry-forward of net energy credits for domestic/irrigation/water-works consumers, a 3.8 units per kW per day capping on average generation, and lapse of surplus energy for other consumer categories (p3). Clause 7 deletes the review clause (p3–4).

By clause 1.3 the amendment applies to all grid-interactive solar rooftop PV systems with or without battery energy storage installed and commissioned in DISCOM areas of Tripura (p1).

Standard name
Net Metering and Rooftop Solar

Read with this

Voltaic does not hold the regulation itself.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document