Grid Interactive Solar Rooftop PV Gross/Net Metering Regulations, 2024 — First Amendment, 2025 — Explanatory Memorandum — Draft

Draft Tripura Electricity Regulatory Commission (The Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024 (First Amendment), 2025

Explanatory memorandum to a draftDated 17 Oct 2026

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Grid Interactive Solar Rooftop PV System under Gross/Net Metering Regulations, 2024 — Second Amendment, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanation for a draft amendment to its 2024 rooftop solar net/gross metering regulations, published for stakeholder comment under s.181(3) of the Electricity Act, 2003 (p1, p9). It records that TREDA and TSECL sought changes to the notified 2024 framework (p1), and then sets out, item by item, the wording proposed to replace existing sub-regulations together with the reason for each change.

Items (a) and (b) deal with eligibility tables. Regulation 5.3's capacity bands for individual, group-point and gross metering are redrawn to allow a DC-side tolerance of up to 10% taken from an MNRE advisory, while keeping inverter AC capacity capped at the consumer's contracted load/demand (p1–2). Regulation 5.4's voltage-level bands are redrawn to push three-phase LT supply up to 150 kW and align with the Supply Code (Third Amendment), 2025, so PM-SURYAGHAR government buildings can stay on LT (p3–4).

Item (c) raises the share of a distribution transformer/feeder that may host net/gross-metered solar, aligning it with the 2023 Group and Virtual Net Metering Guidelines (p4). Item (d) splits the feed-in tariff by consumer category — 35 percent of Average Cost of Supply for domestic and government-subsidised irrigation, 17 percent for non-subsidised irrigation and water works — so TREDA can build a maintenance corpus and TSECL can meet its RPO (p4–5).

Item (e) keeps first-come-first-served technical feasibility but adds that the licensee bears service-line and network augmentation capex for government establishments, recoverable through ARR (p5–6). Item (f) routes payments to individual prosumers' bank accounts and, for subsidised irrigation, directly to a Central/State Project Implementing Agency (p6–7). Item (g) restates monthly and quarterly settlement, the 100-unit payout threshold, the 3.8 units/kW/day generation cap and lapse of surplus (p7–9). Item (h) adds a new Regulation 16.8 on virtual net metering allocation, billing and lapse (p9).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Renewable energy tariff

Read with this

Voltaic does not hold the regulation itself.

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document