MERC · Maharashtra Electricity Regulatory Commission
Public Notice Inviting Comments on Draft Regulations, 2026
Inviting comments, suggestions and / or objections on Draft Regulations
Public notice on a draftReleased with the explanatory memorandum dated 22 Sep 2026Advt. No. 39/2026
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Battery Energy Storage Systems Regulations, 2026 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC public notice inviting comments, suggestions and objections on seven draft regulations (p2). The drafts cover intra-state transmission connectivity and general network access; distribution open access; grid-interactive rooftop renewable generating systems; battery energy storage systems; and second amendments to the forecasting/scheduling/deviation-settlement regulations for solar and wind, the RPO/REC framework regulations, and the State Grid Code (p2).
The drafts and explanatory memorandum are available on MERC's website (p2). Stakeholders may submit through the E-Public Consultation tab within 21 days; those without electronic access may file hard copies with the Secretary by 5 PM on 12 October 2026 (p2). Counter submissions to others' comments are due within 3 days, by 15 October 2026 (p2). The Commission says it will consider all comments and counter submissions received by 15 October 2026 before finalising the drafts, and future communication will be through its website (p2). The notice is marked Advt. No. 39/2026 (p2).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the explanatory memorandum dated 22 Sep 2026Battery Energy Storage Systems Regulations, 2026 — Draft
- Dated 22 Sep 2026Explanatory memorandum: Proposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum
- Dated 9 Oct 2026Notice extending the date for comments: Public Notice — Extension of Last Date for Comments, Objections and Counter Submissions on Draft Regulations
Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.