Maharashtra Electricity Regulatory Commission (Battery Energy Storage Systems) Regulations, 2026

Draft regulationReleased with the explanatory memorandum dated 22 Sep 2026No. MERC/Tech/____/2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft of the Commission's principal framework regulation for battery energy storage in Maharashtra, issued for previous publication (p1). The preamble sets out the rationale — storage as a system resource for RE integration, resource adequacy, peak management and ancillary services — and anchors it in the Electricity (Amendment) Rules, 2022 treating energy storage as part of the power system, and in the Maharashtra Renewable Energy & Energy Storage Policy 2025-26 to 2035-36 (p1–2).

Regulations 1–3 give the title, commencement on Gazette publication, territorial extent, definitions and a broad scope covering planning, procurement, ownership, operation, scheduling, metering and settlement, listing the entities bound — generators, transmission and distribution licensees, standalone BESS developers, open access consumers, captive plants, RE developers, Lead ESS, STU, MSLDC, and consumers/prosumers with storage (p2–4).

Regulation 4 is the core classification chapter: it recognises five deployment models — generation-linked, transmission-linked, distribution-linked, standalone and consumer-side — plus Lead ESS aggregation, and for each sets out who may own or contract it and the permitted services (p4–6). Regulation 5 assigns planning duties: STU to fold storage into transmission planning, distribution licensees into resource adequacy and network planning with techno-economic assessment, and generators/developers to plan their own (p6–7).

Regulation 6 governs procurement, favouring competitive bidding under Section 63 with Ministry of Power guidelines, allowing Battery-as-a-Service structures, and permitting Section 62 procurement only exceptionally with Commission approval under the MYT Regulations (p7–8). Regulation 7 makes standalone BESS a distinct asset class; Regulation 8 sets connectivity thresholds and the minimum duration, with a proviso deeming pre-notification projects (financial closure or construction commenced) compliant (p8–9). Regulations 9–11 cover procedures to be framed by MSLDC, STU and DISCOMs, open access and inter-state transactions with a charge exemption for storage-only drawal, and energy accounting, despatch and DSM (p9–10). Regulations 12–17 are compliance chapters: technical standards, metering, telemetry, cyber security, safety, operational records and end-of-life disposal (p10–11). Regulations 18–22 are boilerplate — dispute resolution via CGRF or the Commission, and powers to direct, relax, amend and remove difficulties (p11–12).

Standard name
Energy Storage
Primary topics
Energy storage deployment, Power procurement and PPAs, Scheduling and despatch

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document