TNERC · Tamil Nadu Electricity Regulatory Commission
Intra State Open Access Regulations 2005
Tamil Nadu Electricity Regulatory Commission - Intra State Open Access Regulations 2005
RegulationDated 24 Jun 2005Published in the Gazette 3 Aug 2005TNERC/ISOA/11/1 dated 24.06.2005
Replaced by Grid Connectivity and Intra-State Open Access Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Tamil Nadu Electricity Regulatory Commission's Intra State Open Access Regulations 2005, notified as Notification No. TNERC/ISOA/11/1 dated 24 June 2005 and published in the Tamil Nadu Government Gazette on 3 August 2005, create the framework for open access within Tamil Nadu. Under s.181 of the Electricity Act 2003, the regulations apply to use of the intra-state transmission system and/or distribution systems of licensees, including in conjunction with inter-state transmission (p4). They come into force on the date of Gazette publication (p1–2).
Regulations 2–3 define core terms — open access, open access customer, direct and embedded customers, allotted and reserved transmission capacity, STU, SLDC, wheeling, Grid Code, nodal agency — and confine the consumer definition to consumers within Tamil Nadu (p2–3). Regulation 4 makes licensees, generating companies, captive generators, generation plants and traders eligible for transmission access, and licensees, generators/captives and consumers eligible for distribution access, subject to payment of Commission-determined charges; insolvent/bankrupt persons or those with dues older than two months are barred (p4). Existing wheeling agreements continue on same terms until expiry, with transition to long-term open access on 30 days' prior application (p5).
Regulations 5–8 classify customers into short-term (one year or less) and long-term (five years or more), treat intermediate applications as short-term (max one year at a time) and treat non-conventional energy generators as long-term irrespective of capacity (p5). Allotment priority puts distribution licensees first, then long-term, then short-term customers, with renewal priority and first-come-first-served rules, and capacity availability is computed for each transmission segment and substation by formula, updated monthly by STU (p6–7).
Regulation 9 specifies the charge heads: transmission/wheeling charges; cross-subsidy surcharge for subsidising consumers; additional surcharge for stranded distribution licensee obligations; scheduling and system operation charges; UI pricing (to be determined separately, with payment possibly deferred); reactive energy charges; grid availability/back-up charges; and restoration charges following default (p7–11). Regulation 10 designates STU as nodal agency for long-term access and SLDC for short-term access, with CTU/RLDC for inter-state (p11).
Regulation 11 phases open access: first phase for HT consumers with load of 10 MW and above within six months of commencement; second phase for 5 MW after six months but before eighteen months; third and final phase for 1 MW and above after eighteen months but before 30 December 2008; captive and non-conventional generators eligible irrespective of contract demand for own use (p12). Procedures for long-term (STU, application fee, 30-day feasibility, agreement fee, system strengthening studies) and short-term (SLDC, application fee, 15-day feasibility, non-transferable reserved capacity, underutilisation consequences) access follow (p12–15), along with curtailment priority, metering, energy losses, Grid Code compliance, payment security, collection/disbursement, an information-posting regime, grievance redressal, difficulty-removal powers, force majeure, amendment power and savings clauses (p15–21).
Read with this
Amendments and corrections
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.