Tamil Nadu Electricity Regulatory Commission (Grid connectivity and Intra-State Open Access) Regulations, 2014
RegulationDated 13 Mar 2014Notification No. TNERC/GC&ISOA/11/2 dated 13-03-2014
1 amendment to it is on Voltaic, dated 16 Mar 2022.
A later regulation on Voltaic changes some of its provisions: Terms and Conditions for Green Energy Open Access Regulations, 2025.
Summary
Summary written by software, from pages 1 to 42 of 76. Check the regulator's original before you rely on it.
This is the Tamil Nadu Electricity Regulatory Commission's principal regulation for connecting to the State grid and for using the intra-state transmission and distribution systems on a non-discriminatory basis. It repeals the Commission's 2005 intra-state open access regulations and replaces them with a single framework covering both connectivity and open access (p2).
Chapter 1 (p3–7) gives the short title, provides that the regulations take effect on the date of Tamil Nadu Government Gazette publication, limits scope to intra-state transmission and/or distribution systems in Tamil Nadu including where used with the inter-state system, and defines the vocabulary — open access and open access customer, allotted versus reserved capacity, the 66 kV-and-above transmission / 33 kV-and-below distribution split, nodal agency, imbalance and wheeling.
Chapter 2 (p7–15) sets the connectivity gateway: which consumers and generators qualify for transmission-system connectivity rather than distribution-system connectivity, the application route to the STU with a graded non-refundable fee and a concession for co-generation and renewables, the interconnection studies and CEA standards applied, the connectivity and tripartite agreements, and how infirm power may be injected for testing before COD.
Chapter 3 (p15–17) states who is eligible for open access, the independent-feeder requirement and the exclusion of insolvents and defaulters, and the criteria for granting long-term, medium-term and short-term open access — augmentation of the system being contemplated only for long-term.
Chapter 4 (p17–31) is the procedural core: categories of open access customer; application requirements including an undertaking that no overlapping PPA exists; separate long-term, medium-term and short-term routes with distinct bank guarantees, timelines, agreements and termination rules; short-term sub-routes (advance monthly, day-ahead, contingency) and electronic bidding where capacity is congested; the distribution licensee's consent deadlines and deemed consent; summary rejection of defaulter applications; and the allotment priority ladder.
Chapter 5 (p32–38) specifies the charge heads — transmission charges computed on an annual-transmission-charge formula plus dedicated-system costs, SLDC scheduling and system operation charges, wheeling charges, cross-subsidy surcharge, additional surcharge (with the stranding test and six-monthly filing by the licensee), start-up power charges, parallel operation charges and restoration charges.
Chapter 6 (p38–40) covers scheduling by SLDC under the Tamil Nadu Electricity Grid Code, ABT-compliant metering including check and standby meters and testing/calibration, schedule revision, and how transmission and distribution losses are borne.
Chapter 7 (p41–42) begins the imbalance chapter — day-ahead scheduling, intra-state ABT settlement of deviations with standby support for distribution consumers until ABT is implemented, and compensation for underdrawal caused by the licensee.
Read with this
Amendments and corrections
- Dated 16 Mar 2022Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022
- Dated 18 Sep 2025Changes some provisions: Terms and Conditions for Green Energy Open Access Regulations, 2025
Procedures and orders made under it
- Date not statedProcedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
- Date not statedProcedure for Grant of Connectivity to the Intra-State Transmission System
- Date not statedDetailed Procedure for Open Access in Transmission and Distribution System
Proposed changes (drafts with no final yet)
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.