MERC · Maharashtra Electricity Regulatory Commission
Scheme for Utilisation of Gas-Based Power Generation Capacity, FY 2015-16 & 2016-17
Scheme for utilisation of Gas based power generation capacity
Published with a draftDated 27 Mar 2015No. 4/2/2015-Th-I dated 27th March, 2015
Draft
Voltaic holds no final regulation made from this draft.
Published with the Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Ministry of Power Office Memorandum of 27 March 2015 conveying the President's sanction for a two-year scheme to bring India's idle gas-based generating capacity back into operation using imported spot RLNG bought through a government-run reverse auction (p1). It runs for FY 2015-16 and FY 2016-17 and is to be reviewed afterwards (p8).
Paras 1–4 set the frame. The gas fleet is split into 'stranded' plants that received no domestic gas and plants that received some domestic gas and ran at low PLF in April 2014–January 2015, each listed in an annexure (p1; pp11–14). Power System Development Fund (PSDF) support is budgeted for each year and apportioned between the two groups (p2). An Empowered Pool Management Committee (EPMC) chaired by the Special Secretary/Additional Secretary (Power) runs the scheme on operational matters (p2). Eligibility is limited to plants whose April 2014–January 2015 average PLF was below the target PLF, with the list declared before bidding (pp2–3).
Para 5 is the bargain at the heart of the document: central customs and service-tax relief, state VAT/CST/octroi/entry tax waivers, cuts in pipeline tariff, regasification charges and marketing margin, forfeiture of return on equity by stranded developers with fixed cost capped at debt service and O&M, gas swapping and co-mingling, a waiver of transmission charges and losses, PSDF support limited to incremental generation, and bank relief under RBI guidelines — all available only where the host State agrees to the tax waivers (pp3–5).
Paras 6–11 set the commercial parameters and process: indicative target PLF (differentiated by year and by monsoon/non-monsoon months) and indicative target prices for discoms, both adjustable by the EPMC within the PSDF outlay (pp5–6); GAIL as sole e-bid RLNG procurer, operating through GSPCL inside Gujarat (p6); a reverse e-bidding design in which bidders quote per-unit PSDF support and incremental units, ranked from the lowest, with ceiling prices and a cut-off when either the PSDF or the RLNG budget is exhausted (pp6, 17–18); release of PSDF money to discoms against CEA, GAIL, plant and discom certificates, with all cash flows through a lead-bank Trust & Retention account and support confined to incremental generation over base PLF (pp6–8); and MSTC as bid process manager at PSDF cost (pp8–9). The annexures carry the two plant lists, the revised customs waiver procedure, the gas swap arrangement and the bidding mechanism (pp11–19).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the draft dated 27 Mar 2015Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft
- Dated 21 Nov 2015Public notice: Gas-Based Power Generation Capacity Scheme Implementation Regulations, 2015 — Public Notice Inviting Comments — Draft
- Dated 18 Dec 2015Notice extending the date for comments: Public Notice Extending Comment Deadline on Draft Gas-Based Power Generation Capacity Scheme Regulations, 2015
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.