MERC · Maharashtra Electricity Regulatory Commission
Gas-Based Power Generation Capacity Scheme Implementation Regulations, 2015 — Public Notice Inviting Comments — Draft
INVITING COMMENTS ON DRAFT MERC (IMPLEMENTATION OF SCHEME FOR UTILIZATION OF GAS-BASED POWER GENERATION CAPACITY) REGULATIONS, 2015
Public notice on a draftDated 21 Nov 2015ADVT. No. : 13/2015-16 dated 21.11.2015
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Maharashtra Electricity Regulatory Commission has issued a public notice inviting written comments, suggestions and objections on its draft MERC (Implementation of Scheme for utilization of Gas-based power generation capacity) Regulations, 2015 (p1). The draft regulations are intended to implement a Ministry of Power scheme sanctioned by Office Memorandum No. 4/2/2015-Th.I dated 27.3.2015 (p1). The notice describes the scheme as supplying imported spot RLNG (e-bid RLNG) to stranded gas-based plants and to plants receiving domestic gas, with eligibility linked to average PLF from April 2014 to January 2015 falling below the target PLF; it also mentions exemption from transmission charges and losses and support from the Power System Development Fund (p1). The draft regulations and the Scheme are available on MERC’s websites. Comments must reach the Secretary by 11 December 2015 (p1). The notice is dated 21 November 2015 (p1).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the draft dated 27 Mar 2015Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft
- Dated 27 Mar 2015File: Scheme for Utilisation of Gas-Based Power Generation Capacity, FY 2015-16 & 2016-17
- Dated 18 Dec 2015Notice extending the date for comments: Public Notice Extending Comment Deadline on Draft Gas-Based Power Generation Capacity Scheme Regulations, 2015
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.