MERC · Maharashtra Electricity Regulatory Commission
Public Notice Extending Comment Deadline on Draft Gas-Based Power Generation Capacity Scheme Regulations, 2015
Extension of time for submission of Suggestions/Objections on Draft MERC (Implementation of Scheme for utilization of Gas based power generation capacity) Regulations, 2015
Notice extending the date for comments on a draftDated 18 Dec 2015Advertisement No. 16/2015-16 dated 18th December, 2015
Draft
Voltaic holds no final regulation made from this draft.
Notice extending the date for comments on the Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-page public notice issued by the Secretary, Maharashtra Electricity Regulatory Commission (MERC), under Advertisement No. 16/2015-16 (p1). It concerns public consultation on the draft MERC (Implementation of Scheme for utilization of Gas based power generation capacity) Regulations, 2015.
It records that by an earlier public notice dated 21 November 2015 the Commission had invited comments, suggestions and objections on that draft, with a deadline of 11 December 2015 (p1). The notice's only operative content is the extension of that deadline to 31 December 2015, giving stakeholders roughly three more weeks to respond (p1).
The notice is dated 18 December 2015 and signed by the Secretary, MERC, at Mumbai — i.e. it was issued after the original deadline had already passed, so the extension operates retrospectively on the comment window (p1). It sets out no substantive regulatory content and does not summarise or amend the draft regulations themselves; an analyst interested in the gas-based capacity utilisation scheme must go to the draft regulations, not to this notice.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the draft dated 27 Mar 2015Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft
- Dated 27 Mar 2015File: Scheme for Utilisation of Gas-Based Power Generation Capacity, FY 2015-16 & 2016-17
- Dated 21 Nov 2015Public notice: Gas-Based Power Generation Capacity Scheme Implementation Regulations, 2015 — Public Notice Inviting Comments — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.