MERC · Maharashtra Electricity Regulatory Commission
Implementation of Scheme for Utilization of Gas-based Power Generation Capacity Regulations, 2015 — Draft
Maharashtra Electricity Regulatory Commission (Implementation of Scheme for utilization of Gas-based power generation capacity) Regulations, 2015
Draft regulationReleased with the draft dated 27 Mar 2015
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are the Maharashtra Electricity Regulatory Commission's 2015 Regulations giving effect within the State to the Government of India's Scheme for utilisation of gas-based power generation capacity. They are short — five regulations over two pages — and do one substantive thing: they switch off intra-State transmission charges and transmission losses for a defined slice of gas-fired generation (p1–2).
Regulation 1 gives the title, extends the Regulations to the whole of Maharashtra and brings them into force from 21 November 2015 (p1). Regulation 2 defines the working vocabulary: the Act, the Commission, the Intra-State Transmission System (InSTS), Coincident Peak Demand and Non-Coincident Peak Demand measured at the generation–transmission interface, and the 'Scheme' itself, identified as the Ministry of Power Office Memorandum of 27 March 2015 covering FY 2015-16 and 2016-17 (p1–2).
Regulation 3 is the operative core. No InSTS transmission charges are to be levied, and no transmission losses attributed, to incremental gas-based generation from e-bid RLNG for the two Scheme years (p2). The exemption is deliberately bounded: users who share the total InSTS cost through their contribution to average coincident and non-coincident peak demand keep paying their share as fixed in the Commission's Intra-State Transmission Tariff Orders, and all other transmission open-access regulations continue to apply to such generation (p2).
Regulations 4 and 5 are housekeeping — power to issue Practice Directions and to remove difficulties by order (p2). There are no forms, schedules or annexures.
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 27 Mar 2015File: Scheme for Utilisation of Gas-Based Power Generation Capacity, FY 2015-16 & 2016-17
- Dated 21 Nov 2015Public notice: Gas-Based Power Generation Capacity Scheme Implementation Regulations, 2015 — Public Notice Inviting Comments — Draft
- Dated 18 Dec 2015Notice extending the date for comments: Public Notice Extending Comment Deadline on Draft Gas-Based Power Generation Capacity Scheme Regulations, 2015
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.