Skip to content

CERC · Central Electricity Regulatory Commission

RLDC Fees and Charges Regulations, 2009

Central Electricity Regulatory Commission (fees and charges of Regional Load Despatch Centre and other related matters) Regulations, 2009

Regulation · Gazette copyDated 18 Sep 2009No. L-7/145(160)/2008-CERC. dated 18th September, 2009

Replaced by RLDC Fees and Charges Regulations, 2015

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Fees and Charges of Regional Load Despatch Centre and Other Related Matters Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 93 of 115. Check the regulator's original before you rely on it.

This is CERC's principal regulation for how the Regional Load Despatch Centres, and the National Load Despatch Centre, recover their costs from users of the inter-state grid. It was notified on 18 September 2009, comes into force on publication (p66), and operates over a five-year control period beginning 1 April 2009 (p67).

Chapter 1 (pp66–69) fixes the scope — determination of fees and charges of RLDCs — and defines the working vocabulary: capital cost, additional capitalisation, CAPEX plan, charges, fees, contracted capacity, control period, market operation function, system operation function, pool account, regional entity, scheme, user and the Power System Operation Company.

Chapter 2 (pp70–73) lays down the filing route: the Power System Operation Company applies separately for each RLDC and the NLDC in the Appendix I formats, with an audited CAPEX plan that the Commission prudence-checks; it must serve users, post the application on its website, publish a newspaper notice in the Appendix II format and file an affidavit. It then provides for a truing-up exercise after the control period, with over- or under-recovery settled with interest in instalments, and sets the treatment of capital cost, additional capitalisation, debt-equity and the LDC Development Fund.

Chapter 3 (pp73–77) is the cost-of-service core: components of annual charges — return on equity, interest on loan, depreciation, O&M and human resource expenses, NLDC and corporate office charges and interest on working capital — each with its own methodology, including grossing up return on equity for tax, normative loan and weighted-average interest, straight-line depreciation per Appendix III, normalisation and escalation of O&M and HR costs, working-capital norms, and apportionment of NLDC and corporate office expenses across regions.

Chapter 4 (pp78–80) deals with levy and collection: the split of annual charges between system operation and market operation functions, the basis on which each class of user pays system operation charges, equal sharing of market operation charges, the option for SLDCs to collect on the RLDC's behalf, user registration and registration fees for power exchanges. Chapter 5 (pp80–81) covers monthly billing, reporting of persistent default, late payment surcharge, rebate and the Commission's power to relax. Appendix I (pp81–93) contains the tariff filing forms and supporting-document checklist.

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, Tariff determination, Return, financing and working capital

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document