CERC · Central Electricity Regulatory Commission
RLDC Fees and Charges Regulations, 2009 — Statement of Reasons
Statement of Reasons in respect of the Central Electricity Regulatory Commission (fees and charges of Regional Load Despatch Centre and other related matters) Regulations, 2009.
Statement of reasonsDated 27 Nov 2009L-7/145(160)/2008-CERC dated 27th November 2009
Replaced by RLDC Fees and Charges Regulations, 2015
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Fees and Charges of Regional Load Despatch Centre and Other Related Matters Regulations, 2009 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons for the CERC (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2009 — the explanatory record of why the final regulation says what it says, closing with 'the regulations have been finalized and notified' (p50). It is not itself the operative regulation; it explains the approach and records how stakeholder comments were dealt with.
Section 1 sets the background: the five regional grids and RLDCs, the mandate and functions of the NLDC (pp1–3), and the legal basis for levying RLDC/NLDC fees and charges under s.28(4), the NLDC Rules 2004 and the Removal of Difficulty Sixth Order 2005 (pp3–4). It also summarises the Commission's historical practice of funding RLDCs — budgetary support, transfer to POWERGRID, the ULDC project, annual recovery factor and the 2000–04 charges (pp5–7) — and states the three design principles: recovery of estimated expenses including return on equity, truing up against actuals, and creation of an LDC Development Fund (pp8–9).
Section 2 sets general principles: a five-year control period from 1.4.2009 aligned with the Tariff Regulations 2009, an all-fixed-cost structure, and recovery split into system operation and market operation charges (pp10–12). Section 3 is the cost build-up — capital cost and additional capitalisation, debt-equity ratio, return on equity on a pre-tax grossed-up basis, interest on loan and refinancing gains, depreciation (including IT assets with nil salvage), O&M expenses, human resource expenses (with PRP linked to KPIs to be issued later), interest on working capital, and NLDC/corporate office expenses apportioned by peak demand (pp13–27).
Section 4 deals with recovery: the 80:20 split between system and market operation, which users pay which charge, collection proportions, SLDC as optional collecting nodal agency, and one-time registration fees for users and power exchanges (pp28–34). Section 5 covers billing, late payment surcharge, rebate, and hedging/FERV pass-through (pp35–36). Section 6 is the longest part — responses to the draft, definition by definition and clause by clause (pp37–50). Analysts should read Section 6 alongside the final regulation: several outcomes (date of transfer instead of 1.4.2009, NLDC filing its own petition, omission of initial spares and R&M provisions) exist only as decisions recorded here.
Read with this
The regulation
Amendments and corrections
- Dated 28 Mar 2011RLDC Fees and Charges (First Amendment) Regulations, 2011
Commencement notices and reasons
Other copies of these documents (1)
- Dated 18 Sep 2009RLDC Fees and Charges Regulations, 2009
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.