RLDC Fees and Charges Regulations, 2009 — First Amendment, 2011 — Statement of Reasons

Central Electricity Regulatory Commission (fees and charges of Regional Load Despatch Centre and other related matters) (First Amendment) Regulations, 2011

Statement of reasonsDated 22 Mar 2011File No. L-7/145(160)/2008-CERC dated 22.3.2011

Replaced by RLDC Fees and Charges Regulations, 2015

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Fees and Charges of Regional Load Despatch Centre and Other Related Matters Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons CERC issued alongside its First Amendment to the RLDC Fees and Charges Regulations, 2009. It records the pre-publication consultation — the draft amendment was posted on the Commission's website on 14 December 2010 (p1) — names the four stakeholders who responded, and sets out, issue by issue, the comments received and the Commission's decision. It is not itself the amending instrument; the amendments are directed to be notified in the official gazette (p7).

Paragraph 4 covers Regulation 5 (p2–3): refund or recovery of tariff found excessive or short after truing up, in six equal monthly instalments with simple interest. The argument is over the interest benchmark; a stakeholder wanted a wider margin over the SBI Base Rate, and the Commission refused, keeping the draft margin and cross-referring to the interest rates it had allowed in its rooftop-solar tariff guidelines.

Paragraph 5 covers Regulation 15 (p3–4): actual AMC expenditure on SCADA/EMS to be allowed under O&M after prudence check, rather than met from interest on working capital as one stakeholder suggested. Paragraph 6 covers Regulation 16(2) (p4–5): escalation and averaging of normalized human resource expenses, a 50% uplift for PSU pay revision and an added allowance for anticipated manpower growth, which the Commission explains reflects new responsibilities assigned to NLDC/RLDCs. Paragraph 7 aligns interest on working capital under Regulation 17(2) with the same SBI base-rate discussion (p5).

Paragraph 8 is the notable outcome: the proposed new Regulation 24(6) was dropped in favour of a Note under Regulation 3(25) (p5–6), treating each generating station, or each separately scheduled, metered and accounted stage, as a separate "user" for sharing market operation charges under Regulation 23 and registration fees under Regulation 24, while the generating company remains liable to pay.

Paragraph 9 records that unopposed corrections to Appendices I, II and III were carried into the final regulations, and paragraph 10 directs the Secretary to notify the same in the official gazette (p6–7).

Standard name
SLDC Fees and Charges
Primary topics
SLDC and RLDC fees and charges, ARR and true-up, Operating costs and other income

Read with this

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document