CERC · Central Electricity Regulatory Commission
RLDC Fees and Charges Regulations, 2009 — First Amendment, 2011 — Statement of Reasons
Central Electricity Regulatory Commission (fees and charges of Regional Load Despatch Centre and other related matters) (First Amendment) Regulations, 2011
Statement of reasonsDated 22 Mar 2011File No. L-7/145(160)/2008-CERC dated 22.3.2011
Replaced by RLDC Fees and Charges Regulations, 2015
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Fees and Charges of Regional Load Despatch Centre and Other Related Matters Regulations, 2009 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Objects and Reasons CERC issued alongside its First Amendment to the RLDC Fees and Charges Regulations, 2009. It records the pre-publication consultation — the draft amendment was posted on the Commission's website on 14 December 2010 (p1) — names the four stakeholders who responded, and sets out, issue by issue, the comments received and the Commission's decision. It is not itself the amending instrument; the amendments are directed to be notified in the official gazette (p7).
Paragraph 4 covers Regulation 5 (p2–3): refund or recovery of tariff found excessive or short after truing up, in six equal monthly instalments with simple interest. The argument is over the interest benchmark; a stakeholder wanted a wider margin over the SBI Base Rate, and the Commission refused, keeping the draft margin and cross-referring to the interest rates it had allowed in its rooftop-solar tariff guidelines.
Paragraph 5 covers Regulation 15 (p3–4): actual AMC expenditure on SCADA/EMS to be allowed under O&M after prudence check, rather than met from interest on working capital as one stakeholder suggested. Paragraph 6 covers Regulation 16(2) (p4–5): escalation and averaging of normalized human resource expenses, a 50% uplift for PSU pay revision and an added allowance for anticipated manpower growth, which the Commission explains reflects new responsibilities assigned to NLDC/RLDCs. Paragraph 7 aligns interest on working capital under Regulation 17(2) with the same SBI base-rate discussion (p5).
Paragraph 8 is the notable outcome: the proposed new Regulation 24(6) was dropped in favour of a Note under Regulation 3(25) (p5–6), treating each generating station, or each separately scheduled, metered and accounted stage, as a separate "user" for sharing market operation charges under Regulation 23 and registration fees under Regulation 24, while the generating company remains liable to pay.
Paragraph 9 records that unopposed corrections to Appendices I, II and III were carried into the final regulations, and paragraph 10 directs the Secretary to notify the same in the official gazette (p6–7).
Read with this
The regulation
Amendments and corrections
- Dated 28 Mar 2011RLDC Fees and Charges (First Amendment) Regulations, 2011
Commencement notices and reasons
- Dated 27 Nov 2009RLDC Fees and Charges Regulations, 2009 — Statement of Reasons
Other copies of these documents (1)
- Dated 18 Sep 2009RLDC Fees and Charges Regulations, 2009
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.