OERC · Odisha Electricity Regulatory Commission

Procurement of Energy from Renewable Sources and its Compliance Regulations, 2021 — Draft

Odisha Electricity Regulatory Commission (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021

Draft regulationDated 27 Apr 2021No. OERC/RA/AMEND. REGU. – 8/2013/ Vol.- IV/ 924

Draft

A proposal that has since been finalised as the Procurement of Energy Renewable Sources and its Compliance Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Odisha Electricity Regulatory Commission's public consultation package for a new set of renewable purchase obligation (RPO) regulations. Page 1 is a public notice, dated 27 April 2021, publishing the draft under s.181(3) of the Electricity Act 2003 and inviting objections and suggestions to the Secretary by 31.05.2021 (by 5.00 P.M.) (p1). The Commission states it may modify the draft in light of responses and then approve it for publication in the Official Gazette (p1). Pages 2–16 carry the draft regulation itself.

The draft would repeal the 2015 RE procurement regulations on coming into force (p3) and applies to "obligated entities" in Odisha: distribution licensees (or entities procuring power on their behalf), and consumers of conventional captive generation of 1 MW and above or of conventional open-access/third-party power, with carve-outs for standby captive plant and for fossil-fuel cogeneration (pp5–6). Regulation 4 anchors the instrument: it specifies the means by which RPO may be met — own RE generation, purchase from developers or licensees, exchange purchases, RECs, off-grid and mini-grid generation, biomass co-firing, rooftop net metering and large hydro — and lays out a year-wise Solar, Hydro and Other Non-Solar trajectory, with cross-source flexibility once a category reaches a compliance threshold (pp6–8). Regulations 5–8 allocate duties: CERC RECs as the compliance instrument (pp8–9); a State Agency for accreditation, registration, data collection and reporting (pp9–10); distribution licensees' ARR and monthly reporting duties (pp10–11); and captive/open-access consumer reporting (p11). Regulation 9 builds a monitoring framework around an RPO web-portal, monthly uploads, verification by SLDC and the Electrical Inspector, quarterly publication and penalty computation (pp11–12). Regulation 10 sets consequences of default — penalty into an RPO Fund, permitted uses of the fund, and carry-forward only on genuine difficulty (pp12–13). Regulations 11–13 cover grid connectivity and interconnection, appointment of compliance auditors, and cross-subsidy exemption with 15-minute time-block accounting and no banking for RE third-party sale (pp13–15). Regulations 14–20 are machinery provisions: overriding effect with savings, practice directions, removal of difficulties, power to relax and amend, interpretation and inherent powers (pp15–16).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Power procurement and PPAs

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document