OERC · Odisha Electricity Regulatory Commission
Procurement of Energy Renewable Sources and its Compliance Regulations, 2021
OERC (Procurement of Energy Renewable Sources and its Compliance) Regulations, 2021
RegulationDate not stated
Summary
Summary written by software. Check the regulator's original before you rely on it.
Pages 2–4 define the regulatory vocabulary—Obligated Entity, RPO, renewable energy sources, captive generating plant, hybrid sources, inter-connection point, State Agency and related terms. Clause 3 (p4) fixes scope: all obligated entities in Odisha, including distribution licensees and any other entity procuring on their behalf, captive plants using conventional fossil fuel of 1 MW and above, and consumers procuring fossil-fuel conventional power through open access/third-party sale, with the Commission able to revise the minimum capacity by order.
Clause 4 (pp4–8) is the core: every obligated entity must meet RPO from its own renewable sources, procurement, exchange purchases, or RECs. It specifies eligibility conditions (metering/communication; off-grid threshold 10 kWp/10 kW and above), treats biomass co-firing as non-solar RPO, allows rooftop solar to count towards distribution licensee’s solar RPO, and sets an annual RPO/HPO trajectory table for 2021-22 to 2024-25 (p6). It also provides cross-category adjustment when a category reaches 85% compliance, hybrid apportionment, treatment of storage, CGP RPO rules with 01.04.2016 and capacity augmentation, tariff/ceiling-price provisions, and continuation of prior PPAs.
Clauses 5–8 (pp8–11) cover REC use and deposit with State Agency; designation and functions of State Agency; distribution licensee ARR and reporting duties; and captive/open access consumer RPO reporting and exemptions for fully renewable captive users. Clauses 9–10 (pp11–13) create an RPO Web-portal, monthly/quarterly/annual reporting and verification deadlines, and a penalty/RPO Fund mechanism calculated on shortfall at forbearance price, with carry-forward only for genuine difficulty. Clauses 11–16 (pp13–15) address grid connectivity and evacuation, compliance auditors, cross-subsidy and banking in open access, overriding effect over other OERC instruments, practice directions, and power to remove difficulties.
Read with this
Proposed changes (drafts with no final yet)
Earlier drafts
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.