Skip to content

OERC · Odisha Electricity Regulatory Commission

Procurement of Energy Renewable Sources and its Compliance Regulations, 2021

OERC (Procurement of Energy Renewable Sources and its Compliance) Regulations, 2021

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Pages 2–4 define the regulatory vocabulary—Obligated Entity, RPO, renewable energy sources, captive generating plant, hybrid sources, inter-connection point, State Agency and related terms. Clause 3 (p4) fixes scope: all obligated entities in Odisha, including distribution licensees and any other entity procuring on their behalf, captive plants using conventional fossil fuel of 1 MW and above, and consumers procuring fossil-fuel conventional power through open access/third-party sale, with the Commission able to revise the minimum capacity by order.

Clause 4 (pp4–8) is the core: every obligated entity must meet RPO from its own renewable sources, procurement, exchange purchases, or RECs. It specifies eligibility conditions (metering/communication; off-grid threshold 10 kWp/10 kW and above), treats biomass co-firing as non-solar RPO, allows rooftop solar to count towards distribution licensee’s solar RPO, and sets an annual RPO/HPO trajectory table for 2021-22 to 2024-25 (p6). It also provides cross-category adjustment when a category reaches 85% compliance, hybrid apportionment, treatment of storage, CGP RPO rules with 01.04.2016 and capacity augmentation, tariff/ceiling-price provisions, and continuation of prior PPAs.

Clauses 5–8 (pp8–11) cover REC use and deposit with State Agency; designation and functions of State Agency; distribution licensee ARR and reporting duties; and captive/open access consumer RPO reporting and exemptions for fully renewable captive users. Clauses 9–10 (pp11–13) create an RPO Web-portal, monthly/quarterly/annual reporting and verification deadlines, and a penalty/RPO Fund mechanism calculated on shortfall at forbearance price, with carry-forward only for genuine difficulty. Clauses 11–16 (pp13–15) address grid connectivity and evacuation, compliance auditors, cross-subsidy and banking in open access, overriding effect over other OERC instruments, practice directions, and power to remove difficulties.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Compliance and reporting, Renewable energy certificates (REC)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document