Procurement of Energy from Renewable Sources and its Compliance Regulations, 2021 — Revised Draft

Odisha Electricity Regulatory Commission (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021-

Draft regulationDated 29 Nov 2021No. OERC/RA/RENEWABLE REG. 35/2021/ dated The - November, 2021

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Odisha Electricity Regulatory Commission published this public notice on 29 November 2021 to invite objections and suggestions on a revised draft of the OERC (Procurement of Energy from Renewable Sources and its Compliance) Regulations, 2021 (p1). An earlier draft was published on 27 April 2021; after stakeholder comments the Commission modified it and has now posted the revised draft on its website, with comments due by 15.12.2021 at 5.00 P.M. (p1). After considering the responses, the Commission says it will finalise the draft for publication in the Official Gazette (p1).

The draft regulation itself, numbered No. OERC/RA/RENEWABLE REG. 35/2021/, is made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003 and extends to the whole of Odisha (p3). It would come into force on Gazette publication and would repeal the 2015 Regulations (p3). It defines the concepts used for renewable purchase obligation (RPO) compliance, including obligated entity, renewable energy sources, RECs, hybrid sources, large hydro and the State Agency (pp3–5). It specifies who is an obligated entity — distribution licensees, captive plants of 1 MW and above using fossil fuel, and open access/third-party consumers of conventional fossil-fuel power — and how they may meet RPO through own generation, procurement, power exchanges or RECs (pp5–6).

Chapter 4 sets source-wise RPO trajectories for solar, hydro (HPO) and other non-solar for 2021-22 to 2024-25, rules for cross-carrying excess compliance between categories at 85% and above, and special treatment for hybrid projects, storage and biomass co-firing (pp6–9). Chapters 5–9 deal with RECs and the CERC framework, the State Agency, distribution licensees, captive/open access consumers, and a web-portal monitoring framework with monthly and annual verification and reporting (pp9–13). Chapter 10 sets the default consequences: penalty calculated on shortfall at the forbearance price, an RPO Fund, and possible Section 142 action (pp13–14). Chapters 11–13 cover grid connectivity and interconnection, compliance auditors, and cross-subsidy/no banking for third-party RE sales (pp14–15). The remaining clauses are standard: overriding effect, power to issue orders, remove difficulties, relax, amend, interpret, and inherent powers (pp15–16).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Open access

Read with this

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.