Skip to content

OERC · Odisha Electricity Regulatory Commission

Draft Renewable Purchase Obligation Regulations, 2026

Odisha Electricity Regulatory Commission (Procurement of Energy from Renewable Energy Sources and its Compliance) Regulations, 2026

Draft regulationDated 9 Nov 2026OERC/RA/RPO-46/2026/1787 dated 09.11.2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is a pre-publication consultation package from the Odisha Electricity Regulatory Commission. A public notice (p1), dated 09.11.2026, invites objections and suggestions on the draft Odisha Electricity Regulatory Commission (Procurement of Energy from Renewable Energy Sources and its Compliance) Regulations, 2026, with comments due by 05.12.2026. The notice states that the Commission may modify the draft after stakeholder input and finalise it for Official Gazette publication (p1).

The annexed draft regulations (pp2–19) would repeal the 2021 RPO Regulations and apply across Odisha from the date of Gazette publication (p2). Chapter I covers short title, commencement, definitions and interpretation, including obligated entity, RPO, energy storage obligation, DRES, ESS, State Agency and REC (pp2–5). Regulation 3 defines the obligated entities: distribution licensees, consumers of conventional captive generation, and open access consumers (p5).

Regulation 4 sets the annual RPO framework, with Table 1 giving year-wise component targets for wind, hydro, distributed renewable energy, other renewable energy and total for FY 2026-27 to FY 2029-30 (p6). It specifies source eligibility for each component, fungibility, exclusions, and how RPO applies to captive and open access consumption (pp6–8). Regulation 5 lists compliance routes — direct renewable consumption, RECs, and buyout payment — and lays down accounting and reporting rules (pp8–9). Regulation 6 creates an energy storage obligation with its own trajectory in Table 2 and a renewable-energy-content condition (pp9–10).

Regulation 7 designates SLDC as the State Agency for monitoring and reporting, with Annexure-I forms for distribution licensees and open access/captive entities (p10, pp15–19). Regulation 8 provides for non-compliance reporting and penalty under Section 142 (p10). Regulations 9–10 cover grid connectivity, technical standards, evacuation and metering (pp10–13). Regulations 11–13 address REC eligibility, overriding effect and repeal/savings (p13). Regulations 14–19 give the Commission powers to issue directions, remove difficulties, relax, amend, interpret and depart from procedure (pp13–14).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Energy storage obligation, Renewable energy certificates (REC)

Read with this

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document