SSERC · Sikkim State Electricity Regulatory Commission
Grid Interactive Solar PV Systems Regulations, 2021
Sikkim State Electricity Regulatory Commission (Grid Interactive Solar PV Systems) Regulations, 2021
RegulationDated 31 Dec 2021Published in the Gazette 31 Dec 2021No. 13/SSERC/GIDSES/2021 dated 31.12.2021
3 amendments to it are on Voltaic, the latest dated 2 May 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sikkim State Electricity Regulatory Commission's principal framework for grid-interactive solar PV systems, notified in the Extraordinary Gazette on 31 December 2021 and effective from that publication date (p1). It replaces the Commission's 2014 Grid Interactive Distributed Solar Energy Systems Regulations, which are suppressed by this notification (p1). It was made under sections 61, 86 and 181 of the Electricity Act, 2003 (p1).
Regulation 2 fixes the reach: consumers of distribution licensees taking supply at up to 11,000 volts, including systems owned by a third party, while preserving the State's right to build rooftop projects of any size (p1). Regulation 4 sets the general conditions — who may install, the permissible capacity band relative to connected load/contract demand, parallel operation with interlocking, and a table of output specifications by connection type and supply voltage (p4). Regulation 5 places obligations on the distribution licensee to give non-discriminatory connectivity, publish transformer-level headroom, and applies percentage caps on connectivity for low-tension and high-tension consumers relative to connected load and to transformer/sub-station capacity, with a service-line-cum-development charge where capacity exceeds sanctioned load (p4–5).
The operating core is metering and settlement. Regulation 7 creates a banking facility for solar energy exported in excess of a billing period's consumption, with time-of-day sequencing of withdrawal (p5–6). Regulation 9 governs the net meter and solar meter — who procures, pays for, tests, seals and reads them (p7–8). Regulation 12 gives the accounting method from meter readings, carry-forward of energy credit within a settlement period, no carry-forward beyond it, and payment for banked energy at a share of the Commission-approved Average Power Purchase Cost, together with the statement of accounts the licensee must render (p11–12).
Regulation 10 lets an eligible consumer wheel surplus generation by open access to his own other premises in a stated priority order (p8). Regulation 11 lays out the application route through the Unified Solar Rooftop Portal with two stage-wise timelines — one for subsidy-linked projects and one for non-subsidy interconnection — plus the registration-fee position (p8–11). Regulations 13 to 16 link the scheme to renewable purchase obligation accounting, carve out generators selling under the REC mechanism, apply the State's Supply Code, Grid Code, Standards of Performance and Open Access Regulations to matters not covered, and exempt the solar generation from banking, wheeling, transmission, cross-subsidy and additional surcharges while keeping fixed/demand charges payable (p12–13). Regulations 17–19 give the Commission powers of relaxation, removal of difficulties, amendment and directions (p13).
Read with this
Amendments and corrections
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.