Grid Interactive Distributed Solar PV Systems Regulations, 2021 — First Amendment, 2024

Sikkim State Electricity Regulatory Commission (Grid Interactive Distributed Solar PV Systems) (First Amendment) Regulations, 2024

AmendmentDated 3 Sep 2024Published in the Gazette 4 Sep 2024No. SSERC/2014-15/13/04 dated 03.09.2024

Amends the Grid Interactive Solar PV Systems Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Sikkim State Electricity Regulatory Commission's First Amendment to its Grid Interactive Distributed Solar PV Systems Regulations, 2021 was issued on 3 September 2024 as No. SSERC/2014-15/13/04 and published in the Sikkim Government Gazette Extraordinary dated 4 September 2024 (p1). It takes effect from the date of that Gazette publication (p1).

The amendment is narrow and touches two regulations of the parent instrument. Its applicability clause reaches all distribution licensees and their consumers taking supply at voltages up to 11,000 volts, including grid-interactive solar systems owned by third parties (p1).

Regulation 5 is rewritten: sub-regulations 5 and 6 of the principal regulations are replaced by two tables that cap the maximum peak capacity of a rooftop solar PV system. Table 1 sets the cap by reference to the consumer's sanctioned connected load, with a row for smaller consumers and a formula row for larger ones; Table 2 sets it by reference to the voltage at which the consumer is supplied — low-tension single phase, low-tension three phase, and high tension (p2). The existing provisos to those two sub-regulations survive the substitution (p2).

Regulation 11 gains a new sub-regulation (6): where a rooftop system falls in the small-capacity band and the consumer's sanctioned connected load is less than the capacity of the plant proposed, the sanctioned load is deemed enhanced to that extent, removing the need for a separate load-enhancement step (p2).

Two things are worth flagging. Table 1 cross-refers to a sub-regulation of an earlier 2024 amendment to the same parent regulations, so this instrument operates alongside at least one predecessor amendment (p2). And although it calls itself the 'First Amendment', its own text acknowledges an earlier '(Amendment) Regulations, 2024' — the numbering is inconsistent (p1–2).

Standard name
Net Metering and Rooftop Solar
Primary topics
New connections and load changes

Read with this

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document