SSERC · Sikkim State Electricity Regulatory Commission
Grid Interactive Distributed Solar PV Systems Regulations, 2021 — Amendment, 2024
Sikkim State Electricity Regulatory Commission (Grid Interactive Distributed Solar PV Systems) (Amendment) Regulations, 2024
AmendmentDated 11 Jun 2024Published in the Gazette 12 Jun 2024No. 13/SSERC/2014-15/01 dated 11.06.2024
Amends the Grid Interactive Solar PV Systems Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page gazette notification by which the Sikkim State Electricity Regulatory Commission amends its 2021 regulations for grid-interactive distributed solar PV. It was signed on 11 June 2024 and published in the Sikkim Government Gazette (Extraordinary No. 306) on 12 June 2024, and comes into force from that publication date (p1).
Regulation 2 restates who the framework covers: distribution licensees in Sikkim and their consumers taking electricity at up to 11,000 volts, including grid-interactive solar systems owned by a third party (p1). This looks like a restatement of scope rather than a textual amendment of a numbered provision of the Principal Regulations.
The operative change is to Regulation 11 of the Principal Regulations, which governs the application and approval process. Two entries in the table of timelines in Regulation 11(1)(i) and (ii) — row 12, column 2 — are substituted with a period counted from the date of submission of the work completion report or installation report (p1–2). Regulation 11(2) is replaced so that the distribution licensee must publish Form 1(A), Form 1(B), the connection agreement formats and the installation certificate on its website and at its local offices (p2).
Two new sub-regulations are inserted after Regulation 11(3). New 11(4) gives deemed acceptance, without a technical feasibility study, to complete applications for solar systems up to 10 kW, and requires the licensee to carry out any commensurate enhancement of the consumer's sanctioned load. New 11(5) allocates responsibility for upgrading distribution infrastructure (service line, transformer capacity and the like) between the licensee and the consumer, with a proviso that for systems up to 10 kW the cost of strengthening distribution infrastructure, including the distribution transformer, is included in the licensee's revenue requirement (p2).
Read with this
The regulation
- Dated 31 Dec 2021Grid Interactive Solar PV Systems Regulations, 2021
Amendments and corrections
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.