MERC · Maharashtra Electricity Regulatory Commission
Renewable Energy Tariff Regulations, 2019
Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019
Regulation · Gazette copyDated 30 Dec 2019Published in the Gazette 30 Dec 2019MERC/Tech/Regulation/1235 dated 30 December, 2019
The Gazette copy of the Renewable Energy Tariff Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission’s principal tariff regulation for renewable energy, made under Sections 61, 66 and 86 read with Section 181 of the Electricity Act, 2003 (p39). It was issued on 30 December 2019 and comes into force on publication in the Official Gazette; the Gazette date is printed as 30 December 2019 (p39; p25/p40 headers). It applies from 1 April 2020, and its first Review Period runs for five financial years, FY2020-21 to FY2024-25, with the norms continuing until extended by order or replaced (p46–47).
The regulation first defines the RE technologies and project categories it covers, including wind, small/mini/micro hydro, biomass, non-fossil co-generation, solar PV, solar rooftop, solar thermal, waste-to-energy and hybrid RE projects; it also defines CUF, useful life, storage, eligible project and related terms (p39–45). Scope provisions apply it to new eligible RE projects in Maharashtra selling to distribution licensees whose tariff is determined by the Commission under Section 62 read with Section 86, while existing projects remain governed by prior applicable regulations or RE tariff orders (p45). General reporting duties are placed on distribution licensees, the State Nodal Agency and RE generators (p45–46).
Chapter 1 (p46–51) lays down general principles: review and tariff periods, competitive bidding and adoption of discovered tariffs, generic tariff for solar rooftop and variable charges for biomass/co-generation, project-specific tariff procedure, tariff structure and design, and must-run scheduling/despatch treatment. Chapter 2 (p51–55) sets financial principles for capital cost, debt-equity, loan interest, depreciation, return on equity, working capital interest, O&M expenses, rebate, late payment surcharge, CDM benefits, reactive energy charges, government grants/subsidies and taxes/duties. Chapters 3 to 8 (p55–67) contain technology-specific parameters for wind, small/mini/micro hydro, biomass, non-fossil co-generation, utility-scale solar PV/rooftop PV, and solar thermal projects. Chapter 9 (p67) provides for deviation from norms, power to relax, issue of orders/practice directions, amendment and removal of difficulties. Annexure A (p68–71) contains petition forms, and Annexure B (p72–75) contains monthly fuel and procurement reporting templates.
Read with this
The regulation
- Dated 30 Dec 2019Renewable Energy Tariff Regulations, 2019
Commencement notices and reasons
- Dated 30 Dec 2019RE Tariff Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.