This two-page MERC order extends the life of Maharashtra's renewable energy tariff framework. The MERC (Renewable Energy Tariff) Regulations, 2019 were notified on 30 December 2019 and applied from 1 April 2020, with a first Review Period of five financial years, FY 2020-21 to FY 2024-25, ending on 31 March 2025 (p1). At the end of that period the Commission must either extend the Regulations by order or notify new Regulations. The order quotes Regulation 5.3, which allows extension for a further period "with any modifications through Order" and preserves the existing principles and tariff norms until extension or replacement (p2).
The order records that most RE technologies — wind, solar PV, non-fossil-fuel co-generation, biomass and hybrid projects — must have tariffs discovered through competitive bidding under Central Government guidelines issued under Section 63 of the Electricity Act (p1). For those technologies, MERC only adopts the discovered tariff and does not determine a generic tariff. Generic tariff work under the 2019 Regulations is therefore limited to solar rooftop PV (p1). Variable-charge determination for biomass and non-fossil-fuel co-generation is limited to existing projects whose EPAs were signed on the basis of past generic tariffs; for projects under competitive bidding and for future projects, Commission-determined variable charges do not apply (p1–2).
Finding that the 2019 Regulations still serve their intended purpose in this predominantly competitive-bidding environment, the Commission extends their applicability to the Second Review Period of FY 2025-26 to FY 2029-30 (p2). No modifications are announced, and the order does not print an order number or a Gazette publication date.
Read with this
The regulation
- Dated 30 Dec 2019Renewable Energy Tariff Regulations, 2019
Commencement notices and reasons
- Dated 30 Dec 2019RE Tariff Regulations, 2019 — Statement of Reasons
Other copies of these documents (1)
- Dated 30 Dec 2019Renewable Energy Tariff Regulations, 2019
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.