MERC · Maharashtra Electricity Regulatory Commission
Renewable Energy Tariff Regulations, 2019
Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019
RegulationDated 30 Dec 2019In force from 1 Apr 2020MERC/Tech/Regulation/1235 dated 30 December, 2019
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission issued these principal regulations on 30 December 2019 to set the terms, conditions and norms for determining tariffs for renewable energy projects in Maharashtra (p1, p29). They come into force on publication in the Official Gazette, though the Gazette date is not printed in the text; Regulation 5.1 separately makes them applicable from 1 April 2020 (p1, p8). The first Review Period runs for five financial years, FY 2020-21 to FY 2024-25, and the norms continue after that until MERC extends them by Order or notifies new regulations (p8–9).
Regulation 3 limits the new norms to new RE projects commissioned in Maharashtra and selling to distribution licensees where MERC determines tariff under s.62 read with s.86; existing RE projects stay under prior regulations or RE tariff orders (p7). Eligible projects span wind, small/mini/micro hydro, biomass, non-fossil co-generation, solar PV, rooftop solar PV, solar thermal, waste-to-energy, hybrid RE and biomass gasifier/biogas, with capacity thresholds for hydro and a hybrid resource-mix threshold (p2–4). Chapter 1 (Regs 5–13) then covers the review and tariff periods, the tariff routes — competitive bidding under Central Government guidelines, generic tariff for rooftop solar and variable charges for biomass/co-gen, and project-specific tariff — plus tariff structure, levelised design, and must-run scheduling/despatch (p8–13).
Chapter 2 (Regs 14–26) sets the financial principles: capital cost, debt-equity, loan and interest, depreciation, return on equity, working capital, O&M expenses, rebate, late payment surcharge, CDM benefit retention, reactive charges, treatment of grants/subsidies and taxes (p13–17). The technology chapters then specify parameters for wind (p17–18), small/mini/micro hydro (p18–19), biomass (p19–22), non-fossil co-generation (p23–27), utility-scale and rooftop solar PV (p27–28) and solar thermal (p28–29). They cover capital cost, CUF/PLF, auxiliary consumption, station heat rate, O&M, fuel mix, fossil-fuel limits, calorific value, fuel price and indexation, plus compliance monitoring and energy audit. Chapter 9 (Regs 73–77) provides for deviation, relaxation, practice directions, amendment and removal of difficulties (p29).
Annexure A (pp30–33) contains the petition forms for parameter assumptions and tariff component computation. Annexure B (pp34–35, 37) contains monthly fuel usage, generation and fuel procurement statement templates for biomass and co-generation entities.
Read with this
Commencement notices and reasons
- Dated 30 Dec 2019RE Tariff Regulations, 2019 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 30 Dec 2019Renewable Energy Tariff Regulations, 2019
5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 1 copy in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.