RE Tariff Regulations, 2019 — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TERMS AND CONDITIONS FOR DETERMINATION OF RENEWABLE ENERGY TARIFF) REGULATIONS, 2019 — STATEMENT OF REASONS

Statement of reasonsDated 30 Dec 2019

The commission's reasons for the Renewable Energy Tariff Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 66. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) for the MERC (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2019 — the reasoning record issued with the final RE tariff regulation and dated 30 December 2019 (p1). It is not the operative regulation. It sets out, clause by clause, what the Commission proposed in its October 2019 draft, what the 13 stakeholders who responded said, and what the Commission decided, quoting the modified text of each clause (p1–2).

The Introduction (p1–3) gives the background — the MERC RE Tariff Regulations, 2015 and their January 2017 amendment, the expiry of that review period on 31 March 2020, publication of the draft and Explanatory Memorandum on 26 October 2019, and the comment deadline of 18 November 2019 — and lists the ten chapters, which mirror the final Regulations.

Chapter 1 (p4–13) works through Regulation 2.1 definitions: auxiliary energy consumption, APPC, date of commissioning, eligible projects with or without storage, hybrid RE projects, interconnection point, re-powering, rooftop solar, station heat rate, storage, tariff period, useful life and 'New RE Project'.

Chapter 2 (p14–15) restricts the 2019 Regulations to new projects, tied to commissioning on or after 1 April 2020, leaving existing projects under the earlier regulations or RE tariff orders.

Chapter 3 (p16–31) covers general principles: tariff period equated to useful life; mandatory competitive bidding for wind, solar, biomass, non-fossil cogeneration and hybrid RE, with adoption of bid-discovered tariffs and a priority order for sub-threshold projects; generic tariff confined to rooftop solar plus variable charges for fuel-based RE; the list of technologies getting project-specific tariffs; CUF under-generation compensation; the single-part tariff structure; and scheduling and forecasting duties.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Competitive bidding

Read with this

The regulation

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 1 copy in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document