RERC · Rajasthan Electricity Regulatory Commission

Terms and Conditions for determination of Tariff, 2009 — Fourth Amendment, 2012

Rajasthan Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) (Fourth Amendment) Regulations, 2012

AmendmentDated 18 May 2012No.RERC/Secy/Reg-92 dated 18th May, 2012

Replaced by Terms and Conditions for Determination of Tariff Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amending regulation issued by the Rajasthan Electricity Regulatory Commission on 18 May 2012 (p1). It amends the Commission's 2009 Terms and Conditions for determination of Tariff Regulation, and it deals almost entirely with wind power. Its opening clause substitutes the chapeau of Regulation 83(6) so that the performance parameters for wind power plants apply for 2012-13 and 2013-14 within the MYT Control Period, and expressly leaves the capital cost for 2013-14 to be fixed by a separate order (p1).

The operative amendments then rewrite the cost building blocks used to determine wind tariffs. Regulation 83(6)(b)(i) on capital cost is replaced, including what the capital cost figure must cover — wind energy evacuation up to and including the pooling station, and connectivity charges payable to the state transmission utility — and the text allocates responsibility for building the evacuation system: the developer up to the pooling station, the transmission licensee beyond it to the nearest grid substation, with the Commission free to determine transmission tariff case by case if the developer builds further (p1–2). O&M expenses under Regulation 83(6)(iv) are restated as percentages of capital cost for the plant and of transmission line cost for lines (p2).

The note on interest on working capital and Regulation 83(6)(b)(viii) on interest on long-term loans are replaced by formulae tied to the average State Bank of India Base Rate prevailing in the first six months of the previous year (p2). A note below 83(6)(b)(viii) is replaced to deal with levellised tariff over the useful life of the project, Regulation 85 including its note and proviso is deleted outright, and Appendix-1's depreciation schedule is restructured by renaming an entry and inserting a new one above it (p2–3).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Capital cost and investment

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document