RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for determination of Tariff, 2009 — Fourth Amendment, 2012
Rajasthan Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) (Fourth Amendment) Regulations, 2012
AmendmentDated 18 May 2012No.RERC/Secy/Reg-92 dated 18th May, 2012
Replaced by Terms and Conditions for Determination of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short amending regulation issued by the Rajasthan Electricity Regulatory Commission on 18 May 2012 (p1). It amends the Commission's 2009 Terms and Conditions for determination of Tariff Regulation, and it deals almost entirely with wind power. Its opening clause substitutes the chapeau of Regulation 83(6) so that the performance parameters for wind power plants apply for 2012-13 and 2013-14 within the MYT Control Period, and expressly leaves the capital cost for 2013-14 to be fixed by a separate order (p1).
The operative amendments then rewrite the cost building blocks used to determine wind tariffs. Regulation 83(6)(b)(i) on capital cost is replaced, including what the capital cost figure must cover — wind energy evacuation up to and including the pooling station, and connectivity charges payable to the state transmission utility — and the text allocates responsibility for building the evacuation system: the developer up to the pooling station, the transmission licensee beyond it to the nearest grid substation, with the Commission free to determine transmission tariff case by case if the developer builds further (p1–2). O&M expenses under Regulation 83(6)(iv) are restated as percentages of capital cost for the plant and of transmission line cost for lines (p2).
The note on interest on working capital and Regulation 83(6)(b)(viii) on interest on long-term loans are replaced by formulae tied to the average State Bank of India Base Rate prevailing in the first six months of the previous year (p2). A note below 83(6)(b)(viii) is replaced to deal with levellised tariff over the useful life of the project, Regulation 85 including its note and proviso is deleted outright, and Appendix-1's depreciation schedule is restructured by renaming an entry and inserting a new one above it (p2–3).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 31 Aug 2012Terms and Conditions for determination of Tariff (Fifth Amendment) Regulations, 2012
- Dated 4 Jun 2013Terms and Conditions for determination of Tariff (Sixth Amendment) Regulations, 2013
- Dated 24 Feb 2014Terms and Conditions for Determination of Tariff Regulations, 2009 — Seventh Amendment, 2014
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.