Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Terms and Conditions for determination of Tariff (Sixth Amendment) Regulations, 2013

Rajasthan Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) (Sixth Amendment) Regulations, 2013

AmendmentDated 4 Jun 2013No.RERC/Secy./Reg. 98 dated 4th June, 2013

Replaced by Terms and Conditions for Determination of Tariff Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Sixth Amendment issued by the Rajasthan Electricity Regulatory Commission (RERC) to its 2009 Terms and Conditions for determination of Tariff Regulations, notified at Jaipur on 4 June 2013 as No. RERC/Secy./Reg. 98 (p1). It is a short, single-purpose instrument: it refreshes the normative parameters used to determine generic tariffs for biomass power projects for FY 2013-14, and deletes one provision of the principal regulations. It comes into force on publication in the Official Gazette, though the Gazette date is not printed (p1).

The operative part replaces the first paragraph of Regulation 83(7) so that the performance parameters for biomass tariff determination apply for 2013-14 (p1). Sub-regulation 7(b) is then replaced in full, with a table of normative parameters for biomass projects distinguished by condenser type — water-cooled and air-cooled — covering capital cost per MW (with a footnote listing the transmission-system and connectivity cost components included in that normative capital cost) and station heat rate (p1). Further clauses replace 7(b)(vii) on O&M expenses, expressed as a percentage of capital cost for the plant and a different percentage for associated transmission lines; replace the notes under 7(b)(x) and 7(b)(xi) so that interest on working capital and on long-term loans are computed as margins over the average State Bank of India Base Rate prevailing in the first six months of the previous year; and replace note (ii) under 7(b)(xi) to require the fixed cost to be levellised over a period matching the useful life of the project (p1–2).

Paragraph 8 deletes Regulation 84(3) together with its notes (a) and (b) (p2). The document matters to biomass developers, the distribution licensees buying biomass power, and Commission staff working on FY 2013-14 generic tariff orders; everything else must be read back into the 2009 principal regulations as previously amended.

Standard name
Tariff Regulations
Primary topics
Renewable energy tariff, Capital cost and investment, Operating costs and other income

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document