RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for determination of Tariff (Sixth Amendment) Regulations, 2013
Rajasthan Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) (Sixth Amendment) Regulations, 2013
AmendmentDated 4 Jun 2013No.RERC/Secy./Reg. 98 dated 4th June, 2013
Replaced by Terms and Conditions for Determination of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Sixth Amendment issued by the Rajasthan Electricity Regulatory Commission (RERC) to its 2009 Terms and Conditions for determination of Tariff Regulations, notified at Jaipur on 4 June 2013 as No. RERC/Secy./Reg. 98 (p1). It is a short, single-purpose instrument: it refreshes the normative parameters used to determine generic tariffs for biomass power projects for FY 2013-14, and deletes one provision of the principal regulations. It comes into force on publication in the Official Gazette, though the Gazette date is not printed (p1).
The operative part replaces the first paragraph of Regulation 83(7) so that the performance parameters for biomass tariff determination apply for 2013-14 (p1). Sub-regulation 7(b) is then replaced in full, with a table of normative parameters for biomass projects distinguished by condenser type — water-cooled and air-cooled — covering capital cost per MW (with a footnote listing the transmission-system and connectivity cost components included in that normative capital cost) and station heat rate (p1). Further clauses replace 7(b)(vii) on O&M expenses, expressed as a percentage of capital cost for the plant and a different percentage for associated transmission lines; replace the notes under 7(b)(x) and 7(b)(xi) so that interest on working capital and on long-term loans are computed as margins over the average State Bank of India Base Rate prevailing in the first six months of the previous year; and replace note (ii) under 7(b)(xi) to require the fixed cost to be levellised over a period matching the useful life of the project (p1–2).
Paragraph 8 deletes Regulation 84(3) together with its notes (a) and (b) (p2). The document matters to biomass developers, the distribution licensees buying biomass power, and Commission staff working on FY 2013-14 generic tariff orders; everything else must be read back into the 2009 principal regulations as previously amended.
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 18 May 2012Terms and Conditions for determination of Tariff, 2009 — Fourth Amendment, 2012
- Dated 31 Aug 2012Terms and Conditions for determination of Tariff (Fifth Amendment) Regulations, 2012
- Dated 24 Feb 2014Terms and Conditions for Determination of Tariff Regulations, 2009 — Seventh Amendment, 2014
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.