RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for determination of Tariff (Fifth Amendment) Regulations, 2012
Rajasthan Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) (Fifth Amendment) Regulations, 2012
AmendmentDated 31 Aug 2012No.RERC/Secy./Regulation 94 dated 31st August, 2012
Replaced by Terms and Conditions for Determination of Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page notification by which the Rajasthan Electricity Regulatory Commission amends its principal tariff-determination regulations. Issued as Regulation No. 94 dated 31 August 2012 (p1), it substitutes Regulation 28 of the RERC (Terms and Conditions for determination of Tariff) Regulations, 2009 in full, rather than altering it in part (p1).
The replacement clause governs interest on working capital. It fixes the rate on a normative basis at 250 basis points above the average State Bank of India Base Rate prevailing in the first six months of the previous year (p1). The normative computation is to be applied even where the licensee or generating company has taken no working-capital loan from any outside agency, and any difference between the normative and actual interest is to be treated as part of gain or loss on controllable factors (p1).
The amendment takes effect on publication in the official Gazette; that Gazette date is not printed in the document (p1).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 18 May 2012Terms and Conditions for determination of Tariff, 2009 — Fourth Amendment, 2012
- Dated 4 Jun 2013Terms and Conditions for determination of Tariff (Sixth Amendment) Regulations, 2013
- Dated 24 Feb 2014Terms and Conditions for Determination of Tariff Regulations, 2009 — Seventh Amendment, 2014
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.