Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025

Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025

AmendmentDated 15 Jul 2025HPERC-H(1)25/2024 dated the 15th July, 2025

Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to HPERC's Deviation Settlement Mechanism Regulations, 2024, notified at Shimla on 15 July 2025 under s.181 of the Electricity Act 2003 (p1). It comes into force on publication in the Rajpatra, Himachal Pradesh; that Gazette date is not printed (p1).

Regulation 2 rewrites three definitions in Regulation 2 of the Principal Regulations (p1–2). 'Contract rate' is restated as a cascade covering sellers whose tariff is determined or adopted under s.62, s.63 or s.86(1)(b); sellers on power exchanges; open-access and captive renewable sellers (weighted average ACP of the Integrated-Day Ahead Market segments); and multi-contract weighted averages. 'Reference Charge Rate' (RR) gets a parallel cascade for general sellers. A new clause (zo) defines 'MSW seller' to cover Municipal Solid Waste and refuse-derived-fuel based generating stations — the amendment's clearest extension of scope.

Regulation 3 updates a key design parameter in Regulation 5, swapping the cross-reference from CERC's DSM Regulations 2022 to the 2024 version (p2).

Regulation 4 substitutes Regulation 7 in full (p2–5), restating the charges-for-deviation framework: a frequency-linked table for general sellers other than run-of-river stations; a frequency-independent table for run-of-river stations; and buyer-side slabs keyed to volume limits VLB (1)–(3) against a normal rate of charge.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.