Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft
Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024
Draft regulationDated 2 Feb 2024HPERC-H(1)25/2021 dated 2nd February , 2024
Draft
A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's draft (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, issued with a notification dated 2 February 2024 (p1). The preamble explains that the State's 2018 DSM Regulations — as amended in 2019 and 2021 — are to be replaced so that the State's deviation regime aligns with the CERC DSM Regulations, 2022 and with two CERC orders (December 2022 and February 2023) that modified Regulation 8 of those regulations (p1). An earlier draft published in January 2023 could not be finalised, so the Commission has re-issued the draft in its 2024 form (p1–2). The draft is published for objections and suggestions, which must reach the Secretary within thirty days of publication of the notification in the Rajpatra (p2).
The draft has nineteen regulations. Regulations 1–2 set commencement (on publication in the Rajpatra) and a long list of defined terms — seller and buyer categories, State Entity, deviation, URS, QCA, RE-Rich State, time-block, reference charge rate and the like (p2–6). Regulation 3 states the objective of grid discipline and grid security, and Regulation 4 fixes the scope: the State Distribution Licensee(s), State sector generating stations and open access customers connected to the State grid (p7).
Regulation 5 is the framework provision, laying out fourteen design parameters (A) to (N): scheduling period; least-cost despatch; consolidated scheduling of State Entities at the State periphery with loss loading; deviation computation formulae; weekly settlement; units of measurement; charge rates; frequency adherence bands; loss allocation; data submission by non-State-Entity stations; procurement of URS by SLDC; congestion charges; and meter data, telemetry and communication to SLDC (p7–13). Regulation 6 deals with declaration of capacity, scheduling and the elimination of gaming (p13–14). Regulation 7 sets the structure of deviation charges for sellers and buyers, differentiated by entity type — general sellers, wind/solar/hybrid (WS) sellers, run-of-river stations — and by frequency band (p14–18). Regulations 8 to 10 cover contravention, compliance with SLDC instructions, and weekly accounting, billing and the State Deviation Pool Account (p18–20).
Regulation 11 gives special scheduling and billing treatment to open access customers who are also retail consumers of the Distribution Licensee (p20–22). Regulation 12 sets the payment schedule, interest for delay and letter-of-credit requirements (p22–24), Regulation 13 directs surplus funds to a State Power Systems Development Fund (p24–25), and Regulations 14–18 give the Commission powers to relax, direct, amend, remove difficulties and override other instruments. Regulation 19 repeals the 2018 Regulations with savings for past actions and for continuation of the Pool Account and the Fund (p25–26).
Read with this
The regulation
- Dated 20 May 2024Deviation Settlement Mechanism and Related Matters Regulations, 2024
Amendments and corrections
- Dated 28 Jan 2025Deviation Settlement Mechanism and Related Matters Regulations, 2024 — First Amendment, 2025
- Dated 15 Jul 2025Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025
- Dated 28 Mar 2026Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Third Amendment, 2026
Commencement notices and reasons
- Dated 20 May 2024Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Finalisation Order
- Dated 22 Jan 2025Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024 — Finalisation Order, 2025
- Dated 15 Jul 2025Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025 — Finalisation Order
- Dated 27 Mar 2026Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026 — Finalisation Order
Earlier drafts
- Dated 23 Nov 2024Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024 — Draft
- Dated 26 Apr 2025Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025 — Draft
- Dated 17 Jan 2026Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.