Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft

Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Draft regulationDated 2 Feb 2024HPERC-H(1)25/2021 dated 2nd February , 2024

Draft

A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's draft (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, issued with a notification dated 2 February 2024 (p1). The preamble explains that the State's 2018 DSM Regulations — as amended in 2019 and 2021 — are to be replaced so that the State's deviation regime aligns with the CERC DSM Regulations, 2022 and with two CERC orders (December 2022 and February 2023) that modified Regulation 8 of those regulations (p1). An earlier draft published in January 2023 could not be finalised, so the Commission has re-issued the draft in its 2024 form (p1–2). The draft is published for objections and suggestions, which must reach the Secretary within thirty days of publication of the notification in the Rajpatra (p2).

The draft has nineteen regulations. Regulations 1–2 set commencement (on publication in the Rajpatra) and a long list of defined terms — seller and buyer categories, State Entity, deviation, URS, QCA, RE-Rich State, time-block, reference charge rate and the like (p2–6). Regulation 3 states the objective of grid discipline and grid security, and Regulation 4 fixes the scope: the State Distribution Licensee(s), State sector generating stations and open access customers connected to the State grid (p7).

Regulation 5 is the framework provision, laying out fourteen design parameters (A) to (N): scheduling period; least-cost despatch; consolidated scheduling of State Entities at the State periphery with loss loading; deviation computation formulae; weekly settlement; units of measurement; charge rates; frequency adherence bands; loss allocation; data submission by non-State-Entity stations; procurement of URS by SLDC; congestion charges; and meter data, telemetry and communication to SLDC (p7–13). Regulation 6 deals with declaration of capacity, scheduling and the elimination of gaming (p13–14). Regulation 7 sets the structure of deviation charges for sellers and buyers, differentiated by entity type — general sellers, wind/solar/hybrid (WS) sellers, run-of-river stations — and by frequency band (p14–18). Regulations 8 to 10 cover contravention, compliance with SLDC instructions, and weekly accounting, billing and the State Deviation Pool Account (p18–20).

Regulation 11 gives special scheduling and billing treatment to open access customers who are also retail consumers of the Distribution Licensee (p20–22). Regulation 12 sets the payment schedule, interest for delay and letter-of-credit requirements (p22–24), Regulation 13 directs surplus funds to a State Power Systems Development Fund (p24–25), and Regulations 14–18 give the Commission powers to relax, direct, amend, remove difficulties and override other instruments. Regulation 19 repeals the 2018 Regulations with savings for past actions and for continuation of the Pool Account and the Fund (p25–26).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document