Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2024

Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

RegulationDated 20 May 2024In force from 1 Jul 2024HPERC-H(1)25/2024 dated 20th May, 2024

3 amendments to it are on Voltaic, the latest dated 28 Mar 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the HPERC's principal intra-state deviation settlement regulation, notified at Shimla on 20 May 2024 and commencing 1 July 2024 (p1). It replaces the 2018 DSM regulations from commencement, with savings for past actions and continuation of the State Deviation Pool Account and PSDF (p27). Its objective is grid discipline and grid security through commercial settlement of deviations from schedule (p6). It binds buyers and sellers connected to the State Grid — the State Distribution Licensee, State-sector generating stations and open-access customers — and expressly includes the Directorate of Energy, HPPTCL as STU and the SLDC (p6).

Regulation 2 supplies the vocabulary, including State Entity, QCA, WS/general seller, deviation, URS, periphery points, RE-rich State and reference charge rate (pp1–5). Regulation 5 is the operational core: scheduling period, least-cost despatch, consolidated scheduling at the State periphery with loss loading, deviation computation, weekly settlement through a State Deviation Pool Account, units of account, charges, frequency-adherence rules, normal rate linked to NRPC/CERC DSM, loss allocation, data submission, URS procurement, congestion charges and meter/telemetry duties (pp6–13). Regulation 6 covers declaration, scheduling and gaming; Regulation 7 sets the seller and buyer charge matrices across frequency conditions and deviation slabs, plus infirm and start-up power (pp14–18). Regulations 8–10 require SLDC publication and reporting and prescribe weekly accounts, billing, shortfall adjustment and the payment waterfall (pp18–21). Regulation 11 gives special billing/accounting rules for open-access customers who are also retail consumers (pp21–23). Regulation 12 specifies payment timelines, interest, letter-of-credit obligations and default curtailment (pp23–25); Regulation 13 routes surplus pool funds to the State Power Systems Development Fund (pp25–26). Regulations 14–18 provide relaxation, directions, amendment, difficulty-removal and overriding effect; Regulation 19 repeals and saves (pp26–27).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document