CERC · Central Electricity Regulatory Commission
Transmission Planning and other related matters Regulations, 2017 — Draft
Draft Central Electricity Regulatory Commission (Transmission Planning and other related matters) Regulations, 2017
Draft regulationDated 26 Apr 2017No. L-1/220/2017-CERC dated 26.4.2017
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's draft framework for how inter-State transmission gets planned, issued 26.4.2017 for public consultation (p1). The preamble explains the gap being filled: CEA's manual on transmission planning criteria already covers planning philosophy, limits and studies, but the governance of planning — consultation with agencies and stakeholders, and recovery of ISTS costs under the Sharing Regulations — needed regulation (p1). The regulations would take effect from gazette publication (p1).
Regulations 1–4 give the title, scope, definitions and objectives. Scope covers ISTS and associated intra-State systems and binds CEA, CTU, inter-State transmission licensees, SEBs/STUs, SLDCs, RLDCs, NLDC, RPCs, NPC, DICs and other planning utilities (p1–2). The definitions create the Central Repository of Generators, Central and Regional Study Committees, State Power Committees, and General Network Access — the last usable only once separately made effective by the Commission (p2).
Regulations 5–14 allocate roles: CEA (repository, leading study committees, specifying planning criteria), CTU and STU (planning and coordination), NLDC, RLDCs and SLDCs (operational feedback), generators connected or likely to connect at 132 kV and above (data and project status), DISCOMs, bulk consumers and transmission licensees (data), and the Standing Committee that firms up plans (p3–7).
Regulations 15–18 detail the committee machinery, the Central Repository of Generators and transparency duties — open meetings, disclosure of criteria, assumptions and data, third-party replication of studies, with RTI s.8 governing sensitive information (p7–9).
Regulations 19–25 set the broad planning principles, the considerations for CEA's planning criteria, the classification of upgrades (reliability, economic, interconnection, international, public policy), the annual planning procedure, Commission approval of new ISTS assets, and plan review (p9–15). Regulations 26–27 give an indicative annual information-exchange timetable and require adequate planning manpower with a certification scheme (p15–16).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2016Annexure or form: Committee Report on Transmission Planning, Connectivity, LTA, MTOA and Other Related Matters, 2016
- Released with the notice dated 26 Apr 2017Annexure or form: Transmission Planning Task Force Report, February 2016
- Dated 26 Apr 2017Public notice: Transmission Planning Draft Regulations, 2017 — Public Notice
- Released with the notice dated 26 Apr 2017Explanatory memorandum: Draft Transmission Planning and other related matters Regulations, 2017 — Explanatory Memorandum
- Dated 5 Jun 2017Notice extending the date for comments: Public Notice — Extension of comments deadline, Draft Transmission Planning and other related matters Regulations, 2017
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.