UERC · Uttarakhand Electricity Regulatory Commission
Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations, 2010 — Third Amendment, 2017
UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017
AmendmentDated 8 Sep 2017No. F-9(21)(III)/RG/UERC/2017/990 dated September 08, 2017
See that regulation for the date it took effect and for anything it keeps in force.
Amends the RE and Non-fossil Fuel Co-generation Tariff Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
An amendment to UERC's renewable-energy tariff regulations, notified on 8 September 2017 (p1) as the Third Amendment to the 2010 Principal Regulations. Clause 1 names the instrument and brings it into force from the date of notification; clause 2 substitutes Regulation 29, which the document republishes in full in the form it is to be read (p1).
The substituted Regulation 29 is headed "Small Hydro Generating Plant" and covers small hydro stations up to 25 MW. It sets out technology-specific parameters for determination of generic tariffs — capital cost, O&M expenses for the year of commissioning, capacity utilisation factor and auxiliary consumption — separately for each project size band up to 25 MW and for three commissioning vintages: projects commissioned between 01.01.2002 and 31.03.2007, during FY 2007-08 to 2008-09, and on or after 01.04.2009 (p1–2).
Most of the document is tariff tables. For each of the three vintages there is a schedule giving levellised fixed charges in Rs/kWh for each size band in three alternative forms: a 35-year levellised rate; a rate for the first ten years with a separate rate for the balance of life; and a year-by-year annual tariff running the full 35 years (p2–4). Each size-band column is split into gross tariff, the deduction for accelerated depreciation, and net tariff. The levellised rates for SHPs up to 25 MW are stated to apply only up to an annual CUF of 40%, and from 01.10.2017 (p2).
Read with this
The regulation
- Dated 6 Jul 2010RE and Non-fossil Fuel Co-generation Tariff Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 14 Aug 2012RE Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations (First Amendment) Regulations, 2012
- Date not statedRE Tariff Regulations, 2013 — Sixth Amendment, 2017 & RE Tariff Regulations, 2010 — Third Amendment, 2017 — Statement of Reasons
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.