UERC · Uttarakhand Electricity Regulatory Commission

Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013

Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013

RegulationDated 15 Apr 2013No. F-9(21)/RG/UERC/2013/102 dated 15.04.2013

Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 47. Check the regulator's original before you rely on it.

UERC issued these regulations by notification dated 15.04.2013 (No. F-9(21)/RG/UERC/2013/102) under Electricity Act 2003 s.61(h), 86(1)(e) and 181(zp). They set the tariff and other terms on which electricity from renewable-energy sources and non-fossil-fuel-based co-generating stations is supplied in Uttarakhand, mainly to distribution licensees and local rural grids. They took effect on notification, are to remain in force for five years unless reviewed or extended, and repeal the 2010 UERC regulations on non-conventional and renewable energy sources (pp1–2).

Chapter 1 (pp1–8) contains the short title, commencement, repeal, scope and definitions. The regulations apply to RE and non-fossil co-generation capacity commissioned after commencement that supplies distribution licensees or local rural grids, with technology-specific eligibility conditions; Chapters 4 and 5 are disapplied for pre-existing stations, whose current tariffs continue, except that a solar thermal/PV add-on also applies to them (p2). Chapter 2 (pp8–13) sets eligibility criteria for each source/technology, environmental clearances, generator obligations (DPR, data reporting, SLDC coordination, grid discipline, O&M, PPA amendment, fees and penalties), sale-of-power routes, and open access for captive and third-party use (pp10–13). Chapter 3 (pp13–14) creates the RPO framework, fixing minimum non-solar and solar purchase percentages for obligated entities for 2013-14 to 2017-18.

Chapter 4 (pp14–25) lays down general tariff principles. Generators may choose a generic tariff based on norms or seek project-specific tariff; only solar PV/thermal generic tariffs are ceilings for competitive bidding (p3, pp14–15). It defines the five-year control period beginning FY 2013-14, tariffs running for useful life from CoD, petition requirements, single-part and two-part tariff structures, and financial principles: capital cost and evacuation-cost add-ons, debt-equity, interest, depreciation, return on equity, working capital, O&M escalation, CDM benefit sharing, rebate, late-payment surcharge, subsidy/incentive treatment, taxes, and extra-CUF incentives (pp17–25). RE stations are must-run and outside merit-order dispatch (p25).

Chapter 5 (pp25–33) provides technology-specific normative parameters — capital cost, O&M, CUF, auxiliary consumption, heat rate, fuel prices and fuel-cost indexation formulas — for small hydro, biomass Rankine, non-fossil cogeneration, biomass gasifier, biogas, solar PV, solar thermal, grid-interactive rooftop/small solar PV and wind. It also covers biomass fossil-fuel monitoring, rooftop net-energy settlement, and wind-zone classification. It says the generic tariffs themselves are in Annexure 1 (p33). Chapter 6 begins at p33 with transmission/wheeling charges and loss treatment for open access, exempting supplies to distribution licensees/local rural grids.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

7 more documents belong here and are not on Voltaic: 7 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document