UERC · Uttarakhand Electricity Regulatory Commission
Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2013
RegulationDated 15 Apr 2013No. F-9(21)/RG/UERC/2013/102 dated 15.04.2013
Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 33 of 47. Check the regulator's original before you rely on it.
UERC issued these regulations by notification dated 15.04.2013 (No. F-9(21)/RG/UERC/2013/102) under Electricity Act 2003 s.61(h), 86(1)(e) and 181(zp). They set the tariff and other terms on which electricity from renewable-energy sources and non-fossil-fuel-based co-generating stations is supplied in Uttarakhand, mainly to distribution licensees and local rural grids. They took effect on notification, are to remain in force for five years unless reviewed or extended, and repeal the 2010 UERC regulations on non-conventional and renewable energy sources (pp1–2).
Chapter 1 (pp1–8) contains the short title, commencement, repeal, scope and definitions. The regulations apply to RE and non-fossil co-generation capacity commissioned after commencement that supplies distribution licensees or local rural grids, with technology-specific eligibility conditions; Chapters 4 and 5 are disapplied for pre-existing stations, whose current tariffs continue, except that a solar thermal/PV add-on also applies to them (p2). Chapter 2 (pp8–13) sets eligibility criteria for each source/technology, environmental clearances, generator obligations (DPR, data reporting, SLDC coordination, grid discipline, O&M, PPA amendment, fees and penalties), sale-of-power routes, and open access for captive and third-party use (pp10–13). Chapter 3 (pp13–14) creates the RPO framework, fixing minimum non-solar and solar purchase percentages for obligated entities for 2013-14 to 2017-18.
Chapter 4 (pp14–25) lays down general tariff principles. Generators may choose a generic tariff based on norms or seek project-specific tariff; only solar PV/thermal generic tariffs are ceilings for competitive bidding (p3, pp14–15). It defines the five-year control period beginning FY 2013-14, tariffs running for useful life from CoD, petition requirements, single-part and two-part tariff structures, and financial principles: capital cost and evacuation-cost add-ons, debt-equity, interest, depreciation, return on equity, working capital, O&M escalation, CDM benefit sharing, rebate, late-payment surcharge, subsidy/incentive treatment, taxes, and extra-CUF incentives (pp17–25). RE stations are must-run and outside merit-order dispatch (p25).
Chapter 5 (pp25–33) provides technology-specific normative parameters — capital cost, O&M, CUF, auxiliary consumption, heat rate, fuel prices and fuel-cost indexation formulas — for small hydro, biomass Rankine, non-fossil cogeneration, biomass gasifier, biogas, solar PV, solar thermal, grid-interactive rooftop/small solar PV and wind. It also covers biomass fossil-fuel monitoring, rooftop net-energy settlement, and wind-zone classification. It says the generic tariffs themselves are in Annexure 1 (p33). Chapter 6 begins at p33 with transmission/wheeling charges and loss treatment for open access, exempting supplies to distribution licensees/local rural grids.
Read with this
Amendments and corrections
- Dated 15 Oct 2013Renewable Energy and Non-Fossil Co-generation Tariff Regulations, 2013 — First Amendment, 2013
- Dated 20 Jun 2014RE Tariff (Second Amendment) Regulations, 2014 (amending the 2010 Regulations)
- Dated 21 Jul 2015RE Tariff Regulations, 2013 — Third Amendment, 2015
- Dated 9 Sep 2015RE Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations, 2013 — Fourth Amendment, 2015
- Dated 29 Apr 2016Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Fuel Based Co-generating Stations (Fifth Amendment) Regulations, 2016
- Dated 8 Sep 2017Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and Non-Fossil Co-generating Stations (Sixth Amendment) Regulations, 2017
Commencement notices and reasons
- Date not statedRenewable Energy Tariff (Fifth Amendment) Regulations, 2016 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Sixth Amendment, 2017 & RE Tariff Regulations, 2010 — Third Amendment, 2017 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Third Amendment, 2015 — Statement of Reasons
- Date not statedRE Tariff Regulations, 2013 — Fourth Amendment, 2015 — Statement of Reasons
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.