UERC · Uttarakhand Electricity Regulatory Commission
RE Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations (First Amendment) Regulations, 2012
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating stations) (First Amendment) Regulations, 2012
Statement of reasonsDated 14 Aug 2012F-9(21)/RG/UERC/2012/733 dated August 14, 2012
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the RE and Non-fossil Fuel Co-generation Tariff Regulations, 2010 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This file contains two things: a Statement of Objects and Reasons (pp1–7) explaining why UERC amended its renewable-energy tariff regulations, and the operative First Amendment Regulations (pp8–9).
The SoR sets out the Commission's promotional mandate under s.86(1)(e) of the Electricity Act and the Central policies behind the 2010 Principal Regulations, then records the trigger for the amendment: UPCL fell short of its non-solar RPO for FY 2011-12 (p2), and small hydro developers repeatedly complained of tripping, breakdowns and voltage fluctuation in UPCL's system causing generation loss, which the Commission found UPCL treated lackadaisically (p2).
Sections 2.1–2.4 give the decisions. Deemed generation is confined to small hydro projects only, with other renewable sources including the small solar capacity in the State deferred until sufficient data exists (pp2–3). Outage-based deemed generation is computed against a monthly interruption ceiling, the earlier annual ceiling being dropped (p3). Voltage-fluctuation loss becomes deemed generation only from 01.04.2013, to give UPCL time to strengthen its system and install capacitor banks (p4). A generator's plea to apply the benefit retrospectively from 06.07.2010 was refused, citing Supreme Court and APTEL authority (p7).
The SoR also records the consultation — public notice of 24.03.2012, hearings in June 2012, a meeting with UPCL officers on 30.07.2012 and six comments received (p2) — and closes with five worked illustrations showing month-wise and annual computation of deemed generation, its capping against normative CUF and the adjustment of deemed generation against actual saleable energy (pp3–7).
The operative part inserts a Force Majeure Event definition into the Principal Regulations (p8) and a new Regulation 44(A) on Deemed Generation (pp8–9), specifying triggering events, voltage bands at the interconnection point, computation methods, annual payment and settlement timelines, the bar on tariff pass-through, the small-hydro/PPA/11 kV eligibility conditions, and commencement on Gazette publication.
Read with this
The regulation
- Dated 6 Jul 2010RE and Non-fossil Fuel Co-generation Tariff Regulations, 2010
Amendments and corrections
Commencement notices and reasons
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.