RE Tariff Regulations, 2013 — Sixth Amendment, 2017 & RE Tariff Regulations, 2010 — Third Amendment, 2017 — Statement of Reasons

Statement of Reasons for UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Sixth Amendment) Regulations, 2017. & Statement of Reasons for UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) (Third Amendment) Regulations, 2017

Statement of reasonsDate not stated

Replaced by RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 26 of 29. Check the regulator's original before you rely on it.

This is the Uttarakhand Electricity Regulatory Commission's Statement of Reasons for two parallel 2017 amendments to its renewable-energy tariff regulations: the Sixth Amendment to the RE Regulations, 2013 and the Third Amendment to the RE Regulations, 2010. The opening pages (p1–2) recite the lineage — RE Regulations 2010 notified 6 July 2010, RE Regulations 2013 notified 15 April 2013, five prior amendments to the 2013 regulations and two to the 2010 regulations — and record that a draft sixth amendment was published on 06.06.2017, comments closed on 22.06.2017 and a hearing was held on 27.06.2017.

The body works through six issues, each with draft text, stakeholder comments and the Commission's decision. Issue 1 (p2–4) deals with competitive bidding for solar PV, the exemption for projects on government-owned land, and the proposal (rejected) for a tariff premium for canal-based plants. Issue 2 (p4–7) rewrites the date-of-commercial-operation definition for solar PV and adds a Performance Ratio definition. Issue 3 (p7–11) extends the life of the principal regulations, revises the RPO trajectory, fixes how RPO is computed for discoms versus open-access and captive consumers, and allows a carry-forward of excess FY 2017-18 obligation. Issue 4 (p11–22) revises small-hydro capital cost, O&M, CUF and auxiliary-consumption norms, supported by an analysis of audited actual O&M data. Issue 5 (p22–24) settles rooftop/small solar net-metering treatment and clarifies the minimum-charge exemption. Issue 6 (p24–26) declines to introduce deemed-generation compensation because it was not previously published, and cites MNRE's August 2017 bidding guidelines.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Competitive bidding, Renewable purchase obligation (RPO / RCO)

Read with this

Read with this: Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013

7 more documents belong here and are not on Voltaic: 7 copies in another language.

It is also read with: RE and Non-fossil Fuel Co-generation Tariff Regulations, 2010

Replaced by Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations Regulations, 2013 · The commission's reasons for the RE and Non-fossil Fuel Co-generation Tariff Regulations, 2010 or one of its amendments. See that regulation for the date it took effect and for anything it keeps in force.

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document