Draft regulationDated 24 Dec 2025HPERC-Grid Code(388) dated 24th December, 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification and full text of the HPERC (Himachal Pradesh Electricity Grid Code) Regulations, 2025, issued by the Himachal Pradesh Electricity Regulatory Commission on 24 December 2025 (p1). It proposes to replace the Himachal Pradesh Electricity Grid Code, 2008 and invites objections and suggestions within thirty days of publication in the Rajpatra (p1). The proposed regulations would extend to the whole State and come into force on Rajpatra publication; the Gazette date is not printed (p1). They apply to all Users connected to or using the intra-State transmission system, including the STU, SLDC and intra-State transmission licensees, while inter-State transmission remains governed by the CERC (Indian Electricity Grid Code) Regulations, 2023 (p1–2).

Chapter 1 (p1–11) gives preliminary provisions, definitions and cross-references to CEA, CERC and HPERC instruments. Chapter 2 (p12–15) sets management of the Grid Code: STU implementation and enforcement, a Grid Code Review Committee, an Operation and Co-ordination Committee and a Protection Co-ordination Committee, and the process for proposing and approving revisions.

Chapter 3 (p16–20) creates a Resource Adequacy Code and System Planning Code: integrated resource planning, demand forecasting, generation resource adequacy and transmission resource adequacy, with STU planning responsibilities, data exchange formats and annual planning cycles. Chapter 4 (p21–24) is the Connection/Connectivity Code: technical and design criteria for connecting to the intra-State transmission system, procedures for first energisation and integration, connectivity agreements, joint system studies, and communication and telemetry obligations. Chapter 5 (p25–27) sets the Protection Code: principles for protective devices, fault clearance times by voltage class, and generator protection requirements.

Chapter 6 (p28–42) is the Commissioning and Commercial Operation Code: drawal of start-up power and injection of infirm power, trial-run requirements for thermal, hydro, wind, solar, storage, hybrid and transmission assets, tests and documents before commercial operation, and declarations of commercial operation. Chapter 7 (p43–74) is the Operating Code: operating philosophy, system security, frequency control and reserves, operational planning, outage planning, operational planning studies, restoration and black-start, real-time operation states, demand and load management, load crash, congestion management, post-despatch analysis and reporting, reactive power management, periodic testing and capacity building.

Chapter 8 (p75–91) is the Scheduling and Despatch Code: control area jurisdiction, SLDC and Discom responsibilities, day-ahead scheduling timelines, corridor allocation for GNA/T-GNA, revision and curtailment rules, energy metering and accounting, and oversight of injection and drawal. Chapter 9 (p92) covers cyber security: framework, audit, reporting and a Cyber Security Coordination Forum. Chapter 10 (p93–94) sets monitoring and compliance, including STU/SLDC monitoring, penalties for non-compliance and third-party audits. Chapter 11 (p95) contains miscellaneous provisions: power to relax, power to remove difficulty, repeal and savings of the 2008 Grid Code, suo motu orders and a clause that the regulations are not to be treated as “Change in law” in contracts.

The appendices (p96–118) supply planning data formats for hydro, transmission and distribution; reactive power and voltage control arrangements including VAr exchange cases; the procedure for data, forecasting and scheduling of intra-State renewable energy generating stations, including QCA/lead generator roles and scheduling cases; and a list of abbreviations.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗