Himachal Pradesh Electricity Grid Code (First Amendment) Regulations, 2018
AmendmentDated 9 Oct 2018HPERC-Grid Code (388) dated 09th October, 2018
Replaced by Himachal Pradesh Electricity Grid Code Regulations, 2026
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Himachal Pradesh Electricity Grid Code, 2008.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to the Himachal Pradesh Electricity Grid Code, 2008, notified by HPERC at Shimla on 9 October 2018 (p1). Rather than issuing a fresh code, it rewrites selected clauses across Chapters 1 to 6 and Annexures 1 to 3 of the parent Code. It takes effect on publication in the Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).
The Chapter 1 amendments restate who the Code binds — all parties connecting to or using the Intra-State Transmission System, including SLDC, and, where the context permits, users of other components of the State Power Grid — and restate Chapter 1's purpose as setting minimum technical and design criteria for the STU and Users (p1). Governor provisions are replaced with a requirement that all thermal and hydro units except those with up to three hours pondage run in Restricted Governor Mode from 01.04.2019, with exemptions granted only by the Commission on petition (p2, p6). Definitions of State Energy Account, State Pool Account, State Sector Generating Stations, Transmission Licensee and User are substituted, and Time Block gains a proviso letting the Commission shorten it to five minutes (p2–4). Chapter 2 adds operation of the State Deviation Pool Account and State reactive energy account to SLDC functions (p4); Chapter 3 redefines Users.
Chapter 4 changes technical criteria: a new response time for 33 kV, primary-response capability obligations for larger thermal, gas and hydro units, communication and telemetry duties, an annual transmission-asset schedule to the Commission, and a new Cyber Security paragraph (p4–5).
Chapter 5 is the largest block. It sets out governor operation and Restricted Governor Mode features, periodic third-party testing, primary-response and VWO-margin rules, limits on sudden output or load changes, protection and relay coordination, frequency and voltage operating bands, and a detailed Demand Management Process covering load-shedding groups and the flow of RLDC/SLDC directions (p5–11). It adds a daily grid performance report on the SLDC website, unique codes for operational instructions, and periodic black-start DG testing (p11).
Chapter 6 recasts the scheduling and despatch framework, defining Collective Transaction, State Entity, SSGS, State Periphery and STU Periphery, and routes deviation, reactive-energy and related settlement through HPERC's 2018 Deviation Settlement Mechanism Regulations (p11–17). Annexures 1–3 update commercial mechanisms, meter functional requirements and terminology (p17–19).
Read with this
The regulation
- Dated 5 Aug 2008Himachal Pradesh Electricity Grid Code, 2008
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 24 Dec 2025Himachal Pradesh Electricity Grid Code Regulations, 2025 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.