Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Himachal Pradesh Electricity Grid Code, 2008

Himachal Pradesh Electricity Grid Code

CodeDated 5 Aug 2008HPERC-Grid Code(388) dated 05 August, 2008

Replaced by Himachal Pradesh Electricity Grid Code Regulations, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 31 of 53. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission notification dated 05 August 2008 specifies the Himachal Pradesh Electricity Grid Code (HPEGC) under s.86(1)(h) of the Electricity Act, 2003. It is to come into effect from the date of publication in the Rajpatra, Himachal Pradesh; the Gazette date is not printed (p1).

The Code governs the intra-state transmission system (IaSTS); inter-state transmission is left to the IEGC, and the Code says it does not affect existing obligations under the IEGC or the Act (p1–2). Chapter 1 sets the objectives, scope, compliance-monitoring split (STU for Chapters 3–4, SLDC for Chapters 5–6), procedures for exemptions, the free-governor requirement for thermal and hydro units with a separately notified effect date, and a reactive-energy charge mechanism to be determined by the Commission (p1–3).

Chapter 2 allocates roles among RLDC, RPC, CTU, CEA, SLDC, STU, transmission licensees, generating companies, distribution licensees, the State Coordination Forum, HPERC and the State Government (pp9–14). Chapter 3 is the Planning Code: STU-led five-year transmission planning, load forecasting by distribution licensees, data exchange, security-based planning criteria, and implementation of transmission schemes (pp15–19). Chapter 4 is the Connectivity Conditions Code: application and offer procedure for new or modified connections, connection agreements, technical design and protection standards, reactive compensation, communication and data facilities, site responsibility schedules, single-line diagrams and annual asset schedules (pp20–27). Chapter 5 begins the Operation Planning and System Security Code: operating policy, system security and governor/AVR requirements, under-frequency load shedding, system protection schemes, restoration, voltage operating ranges, and demand estimation.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Network planning and investment, Connectivity and GNA

Read with this

Amendments and corrections

Proposed changes (drafts with no final yet)

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document