Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
3 documents match “T-GNA corridor allocation”.
State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
- MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID … › 5.3 Provision in Final MERC (State Grid Code) (First …… WRLDC shall check if drawal schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: Provided that in case of constraint in transmission system, …
- MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID … › 5.1 Comments Received… shall allocate at least a minimum floor of 80% of average D-7 secured corridor for DLs with GNA below 50 MW, before applying pure proportional allocation, to protect small licensees' basic demand." Because DLs with small GNA get …
3 matching passages in this document
State Grid Code, 2020 — First Amendment Regulations, 2026
Amends the State Grid Code Regulations, 2020
- 5. Amendment to Regulation 50.2.1 and 50.2.2 of the … › 52.5 Scheduling and Despatch Procedure and timelines for …… SLDC will run a Pilot look-ahead SCED considering the central allocation, allocated reserve considering SCUC. j) By 0800 hrs every day, based on the entitlement declared in accordance with the provisions of IEGC, 2023, SLDC or GNA …
- 5. Amendment to Regulation 50.2.1 and 50.2.2 of the … › 52.5 Scheduling and Despatch Procedure and timelines for …… day for the "D" day and update the availability of balance transmission corridors, if any, after finalisation of schedules for exigency applications on its website. The balance transmission corridor may be utilised by GNA grantees by way …
3 matching passages in this document
Proposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum
Draft- 7.1. Draft MERC (Intra-State Transmission Connectivity and …Such access shall be granted only against surplus capacity in the InSTS remaining available after allocation of GNA. Buyers, or entities acting on behalf of buyers, may submit applications for T-GNA; …
- 7.1. Draft MERC (Intra-State Transmission Connectivity and …… and availability of the requisite corridor and may nominate an alternate supplier where the proposed source cannot be accommodated. 7.1.9. The Draft Regulations further provide for the determination and recovery of applicable charges, …
3 matching passages in this document