Summary
Summary written by software, from pages 1 to 30 of 196. Check the regulator's original before you rely on it.
MERC's principal State Grid Code, MEGC 2020, is notified under s.181(2)(zp) read with s.86(1)(h) of the Electricity Act, 2003 (p6). It extends to the whole of Maharashtra and applies to generators connected to the intra-State transmission system, transmission licensees including STU, Maharashtra SLDC, distribution licensees including deemed licensees and Indian Railways, open access and EHV consumers, and all renewable energy projects, solar/wind parks and park developers connected to InSTS (p8, p19–20). It comes into force on Gazette publication, with DSM/de-centralised merit order provisions and specific clauses deferred to separate notification; until then FBSM under the ABT Order continues (p8). It repeals and supersedes MEGC 2006 with savings (p8). Part A establishes the GCC, its core group and grid coordination conference, functional committees, review process, and roles of STU, SLDC, licensees, users, generators, RE generators/developers and QCA (p19–30). Part B begins the Planning Code, requiring STU planning consistent with CEA's National Electricity Plan (p30). The contents map the remaining Parts C–I: Connection, Operating, Scheduling and Despatch, Communication, Protection, Metering and Miscellaneous, plus annexures (p1–4, p6–7).
Read with this
Amendments and corrections
- Dated 21 Sep 2026State Grid Code, 2020 — First Amendment Regulations, 2026
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.