Skip to content

MERC · Maharashtra Electricity Regulatory Commission

State Grid Code Regulations, 2020

Maharashtra Electricity Regulatory Commission (State Grid Code) Regulations, 2020

RegulationDate not statedNo. MERC/Legal/319-

1 amendment to it is on Voltaic, dated 21 Sep 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 30 of 196. Check the regulator's original before you rely on it.

MERC's principal State Grid Code, MEGC 2020, is notified under s.181(2)(zp) read with s.86(1)(h) of the Electricity Act, 2003 (p6). It extends to the whole of Maharashtra and applies to generators connected to the intra-State transmission system, transmission licensees including STU, Maharashtra SLDC, distribution licensees including deemed licensees and Indian Railways, open access and EHV consumers, and all renewable energy projects, solar/wind parks and park developers connected to InSTS (p8, p19–20). It comes into force on Gazette publication, with DSM/de-centralised merit order provisions and specific clauses deferred to separate notification; until then FBSM under the ABT Order continues (p8). It repeals and supersedes MEGC 2006 with savings (p8). Part A establishes the GCC, its core group and grid coordination conference, functional committees, review process, and roles of STU, SLDC, licensees, users, generators, RE generators/developers and QCA (p19–30). Part B begins the Planning Code, requiring STU planning consistent with CEA's National Electricity Plan (p30). The contents map the remaining Parts C–I: Connection, Operating, Scheduling and Despatch, Communication, Protection, Metering and Miscellaneous, plus annexures (p1–4, p6–7).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

Amendments and corrections

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document