State Grid Code, 2020 — First Amendment Regulations, 2026

Maharashtra Electricity Regulatory Commission (State Grid Code) (First Amendment) Regulations, 2026

AmendmentDated 21 Sep 2026No. MERC/Tech/Regulation/2026/ - dated 21 September 2026

Amends the State Grid Code Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the MERC (State Grid Code) Regulations, 2020, issued by the Maharashtra Electricity Regulatory Commission and dated 21 September 2026 (p36). It extends to the whole of Maharashtra and is to come into force from Gazette publication, but the Gazette date is not printed; several scheduling provisions are expressly deferred until SLDC software or preparedness conditions are met (p20).

Regulation 2 inserts definitions for ancillary services, area control error, gate closure, GNA Regulations and GNA grantee, minimum turndown level, SCED and SCUC (p20–21). Regulation 3 reworks the technical minimum schedule for intra-state thermal generating stations: it sets the minimum turndown level at 55% of Maximum Continuous Rating (MCR), or the CEA-specified lower level, whichever is lower, and creates a compensation mechanism for part-load operation, station heat rate and auxiliary consumption degradation, and additional start-ups (p21–27). A separate sub-regime applies to thermal stations whose tariff is determined under Section 62, with monthly computation, annual reconciliation and NLDC procedure (p24–27).

Regulations 4–6 amend the applicability of the Scheduling and Despatch Code and the roles of sellers, open access generators, bagasse/biomass and captive generators, RE generators connected to InSTS, and distribution-connected generators in specified transactions (p27–28). They also revise day-ahead scheduling principles, including captive and open access consumer requirements, and delete Regulation 52.2.5 (p28).

Regulation 7 substitutes Regulation 52.5, giving a detailed D-1 day-ahead scheduling and despatch timeline for ISGS, WRLDC, SLDC, sellers, buyers, QCAs, power exchange and GNA grantees, including load-generation balance, corridor allocation and forms under Annexure-10 (p29–32).

Regulations 8–11 substitute the revision-of-schedule provisions for forced outages, transmission bottlenecks, intra-state generators, sellers, solar/wind generators and buyers, specifying when revisions take effect in the 7th/8th or 4th time block (p32–35). Footnotes state that the revised 7th/8th-block provisions are deferred until separate notification (p32–35). Regulation 12 amends the applicability of the Annexure-4 compensation mechanism to coal/gas InSTS generating stations according to tariff status and PPA treatment (p35–36).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Generation tariff

Read with this

The regulation

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document