MERC · Maharashtra Electricity Regulatory Commission
State Grid Code, 2020 — First Amendment Regulations, 2026
Maharashtra Electricity Regulatory Commission (State Grid Code) (First Amendment) Regulations, 2026
AmendmentDated 21 Sep 2026No. MERC/Tech/Regulation/2026/ - dated 21 September 2026
Amends the State Grid Code Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the First Amendment to the MERC (State Grid Code) Regulations, 2020, issued by the Maharashtra Electricity Regulatory Commission and dated 21 September 2026 (p36). It extends to the whole of Maharashtra and is to come into force from Gazette publication, but the Gazette date is not printed; several scheduling provisions are expressly deferred until SLDC software or preparedness conditions are met (p20).
Regulation 2 inserts definitions for ancillary services, area control error, gate closure, GNA Regulations and GNA grantee, minimum turndown level, SCED and SCUC (p20–21). Regulation 3 reworks the technical minimum schedule for intra-state thermal generating stations: it sets the minimum turndown level at 55% of Maximum Continuous Rating (MCR), or the CEA-specified lower level, whichever is lower, and creates a compensation mechanism for part-load operation, station heat rate and auxiliary consumption degradation, and additional start-ups (p21–27). A separate sub-regime applies to thermal stations whose tariff is determined under Section 62, with monthly computation, annual reconciliation and NLDC procedure (p24–27).
Regulations 4–6 amend the applicability of the Scheduling and Despatch Code and the roles of sellers, open access generators, bagasse/biomass and captive generators, RE generators connected to InSTS, and distribution-connected generators in specified transactions (p27–28). They also revise day-ahead scheduling principles, including captive and open access consumer requirements, and delete Regulation 52.2.5 (p28).
Regulation 7 substitutes Regulation 52.5, giving a detailed D-1 day-ahead scheduling and despatch timeline for ISGS, WRLDC, SLDC, sellers, buyers, QCAs, power exchange and GNA grantees, including load-generation balance, corridor allocation and forms under Annexure-10 (p29–32).
Regulations 8–11 substitute the revision-of-schedule provisions for forced outages, transmission bottlenecks, intra-state generators, sellers, solar/wind generators and buyers, specifying when revisions take effect in the 7th/8th or 4th time block (p32–35). Footnotes state that the revised 7th/8th-block provisions are deferred until separate notification (p32–35). Regulation 12 amends the applicability of the Annexure-4 compensation mechanism to coal/gas InSTS generating stations according to tariff status and PPA treatment (p35–36).
Read with this
The regulation
- Date not statedState Grid Code Regulations, 2020
Commencement notices and reasons
- Dated 2 Sep 2020State Grid Code Regulations, 2020 — Statement of Reasons
- Dated 25 Sep 2020Operationalisation of Merit Order Stack and Technical Minimum at 55% under State Grid Code Regulations, 2020 — Notification
- Dated 9 Mar 2022Reactive Energy Accounting Framework for Intra-State Hydro Generating Stations under the State Grid Code Regulations, 2020 — Notification, 2022
- Dated 21 Sep 2026State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
Earlier drafts
- Released with the notice dated 1 Mar 2020Maharashtra State Grid Code Regulations, 2020 — Draft
- Released with the notice dated 1 Mar 2020Explanatory memorandum: Draft State Grid Code Regulations, 2020 — Explanatory Memorandum
- Dated 1 Mar 2020Public notice: Draft State Grid Code Regulations, 2020 — Public Consultation Notice
- Dated 23 Mar 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Extension of Time for Submitting Comments
- Dated 16 Apr 2020Notice extending the date for comments: Draft State Grid Code Regulations, 2020 — Comment Deadline Extension Notice, 16 April 2020
- Released with the notice dated 2 Aug 2025State Grid Code (First Amendment) Regulations, 2025 — Draft
- Dated 2 Aug 2025Public notice: Public Notice — Comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
- Released with the notice dated 2 Aug 2025Explanatory memorandum: State Grid Code Regulations, 2020 — First Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 5 Sep 2025Notice extending the date for comments: Public Notice — Extension of time for filing comments on Draft Deviation Settlement Mechanism Regulations, 2025 and Draft State Grid Code (First Amendment) Regulations, 2025
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.