Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
- 3. Amendment to Regulations 3 of the Principal Regulations. › 3.2. Regulations 3.1.1 to 3.1.8 of the Principal …… 3.1.7.Obligated entities may fulfil the specified Renewable Purchase Obligation through one or more of the following methods, namely: i. Consumption of renewable electricity, either directly or through an energy storage system; ii. …
- FIFTH AMENDMENT TO MADHYA PRADESH ELECTRICITY REGULATORY … › 15. Monitoring and Reporting of RPO Compliance by Obligated …… The Bureau of Energy Efficiency shall monitor compliance of obligation under Regulation (3) and submit periodic report to the Commission. For compliance monitoring, all the obligated entities shall furnish the required information duly …
3 matching passages in this document
Ancillary Services Regulations, 2024
- MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (ANCILLARY … › 3. Definitions and Interpretations(12) "Energy Storage" in relation to the electricity system, means a facility where electrical energy is converted into any other form of energy which can be stored, and subsequently reconverted into electrical energy;
- Secondary Reserve Ancillary Service (SRAS) › 7. Eligibility for an SRAS Provider… for an SRAS Provider A generating station or an entity having energy storage resources or an entity capable of providing demand response, on a standalone or aggregated basis, connected to the intra-State transmission system, shall be …
3 matching passages in this document
Generation Tariff Regulations, 2024
- 52. Norms of operation for hydro generating stations › 52.4… beneficiaries shall be entitled to an equivalent energy of 75% of the energy utilized in pumping the water from the lower elevation reservoir to the higher elevation reservoir from the generating station during peak hours and the …
- 46. Computation and Payment of Supplementary Capacity … › 46.2… Computation and Payment of Capacity Charge and Energy Charge for Pumped Storage Hydro Generating Stations: 49.1 The fixed cost of a pumped storage hydro generating station shall be computed on an annual basis, based on norms specified …
3 matching passages in this document
Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2025 (Revision-I)
- CHAPTER 3: PROCEDURE FOR GRANT OF LICENCE › 5 Eligibility for Grant of Licence… company or a person setting up a captive generating plant or an Energy Storage System or a consumer having load of not less than ten Megawatt in case of Intra-State Transmission System shall not be required to obtain licence under the …
- CHAPTER 11 CONNECTION AND USE OF SYSTEM CHARGES › 25 Requirement to Offer Terms of Use of System and …… the network of the Licensee for the purpose of transmission of electrical energy; and b) Such other Persons as the Commission may authorize to use the Transmission System. 25.2 The Licensee shall not be obliged pursuant to Regulation …