MPERC · Madhya Pradesh Electricity Regulatory Commission
Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021(Fifth Amendment) [ARG-33(II)(v) of 2026]
Gazette copyDated 12 Mar 2026No. MPERC /2026/401 dated 12th March 2026
A Gazette copy of the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II or of one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Fifth Amendment rewrites the Renewable Purchase Obligation (RPO) framework of MPERC's 2021 Cogeneration and Renewable Sources regulations. It is issued from Bhopal on 12 March 2026 under s.181 read with s.61(h) and s.86(1)(e) of the Electricity Act 2003 and comes into force on publication in the Madhya Pradesh Gazette (p10).
Regulation 1 sets the short title and territorial extent; Regulation 2 amends the definitions in the Principal Regulations, adding 'Adjudicating Officer', 'Bureau of Energy Efficiency' and 'Distributed Renewable Energy' (the last importing the CEA 2013 connectivity regulations), substituting the definition of RPO, and deleting two existing sub-definitions (p10–11).
Regulation 3 is the operative core. It replaces Regulation 3.1 with a multi-year RPO trajectory disaggregated into wind, hydro, distributed renewable energy (DRE), other renewable and total components, binding distribution licensees, open access consumers and captive users (p11–13). Each component carries eligibility conditions: wind and hydro count only from projects commissioned after 31 March 2024; DRE is limited to projects not exceeding 10 MW and covers all net, gross, virtual and group net metering and behind-the-meter configurations; 'other' sweeps up remaining sources including co-firing of biomass pellets and municipal solid waste charcoal (p12–13). Regulations 3.1.1 to 3.1.8 are substituted wholesale, governing fungibility between components, exclusion of nuclear consumption, the consumption base for open access consumers and captive users, the calculation base for distribution licensees, the permitted compliance routes (own consumption, storage, CERC-issued RECs including under virtual PPAs, or buyout price with proceeds routed to the Central and State Energy Conservation Funds), and aggregation for consumers under common control (p13–15). Regulations 3.1.9–3.1.14 are deleted, and Regulation 3.8(A) is amended to allow compliance through open access purchases and to let consumers requisition green energy by category (p15–16).
Regulations 4 to 6 delete Regulations 12.5–12.7 and 14(B) and insert a new Regulation 13.4 on buyout (p16). Regulation 7 substitutes Regulation 15, making the Bureau of Energy Efficiency the compliance monitor, requiring certified energy accounts and compliance reports on fixed deadlines, and routing shortfalls to penalties imposed by an Adjudicating Officer under s.26(3) of the Energy Conservation Act 2001 (p16–17).
Read with this
The regulation
Amendments and corrections
- Dated 16 Jan 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
- Dated 24 Jan 2023Corrigendum Notice, 24th January 2023
- Dated 31 Mar 2023Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Second Amendment, 2023
- Dated 26 Jul 2023Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Third Amendment, 2023
- Dated 4 Mar 2025Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fourth Amendment, 2025
- Dated 20 Mar 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
- Dated 4 Aug 2026Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
7 more documents belong here and are not on Voltaic: 7 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.