Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026

Madhya Pradesh Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021(Fifth Amendment) [ARG-33(II)(v) of 2026]

Gazette copyDated 12 Mar 2026No. MPERC /2026/401 dated 12th March 2026

A Gazette copy of the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II or of one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Fifth Amendment rewrites the Renewable Purchase Obligation (RPO) framework of MPERC's 2021 Cogeneration and Renewable Sources regulations. It is issued from Bhopal on 12 March 2026 under s.181 read with s.61(h) and s.86(1)(e) of the Electricity Act 2003 and comes into force on publication in the Madhya Pradesh Gazette (p10).

Regulation 1 sets the short title and territorial extent; Regulation 2 amends the definitions in the Principal Regulations, adding 'Adjudicating Officer', 'Bureau of Energy Efficiency' and 'Distributed Renewable Energy' (the last importing the CEA 2013 connectivity regulations), substituting the definition of RPO, and deleting two existing sub-definitions (p10–11).

Regulation 3 is the operative core. It replaces Regulation 3.1 with a multi-year RPO trajectory disaggregated into wind, hydro, distributed renewable energy (DRE), other renewable and total components, binding distribution licensees, open access consumers and captive users (p11–13). Each component carries eligibility conditions: wind and hydro count only from projects commissioned after 31 March 2024; DRE is limited to projects not exceeding 10 MW and covers all net, gross, virtual and group net metering and behind-the-meter configurations; 'other' sweeps up remaining sources including co-firing of biomass pellets and municipal solid waste charcoal (p12–13). Regulations 3.1.1 to 3.1.8 are substituted wholesale, governing fungibility between components, exclusion of nuclear consumption, the consumption base for open access consumers and captive users, the calculation base for distribution licensees, the permitted compliance routes (own consumption, storage, CERC-issued RECs including under virtual PPAs, or buyout price with proceeds routed to the Central and State Energy Conservation Funds), and aggregation for consumers under common control (p13–15). Regulations 3.1.9–3.1.14 are deleted, and Regulation 3.8(A) is amended to allow compliance through open access purchases and to let consumers requisition green energy by category (p15–16).

Regulations 4 to 6 delete Regulations 12.5–12.7 and 14(B) and insert a new Regulation 13.4 on buyout (p16). Regulation 7 substitutes Regulation 15, making the Bureau of Energy Efficiency the compliance monitor, requiring certified energy accounts and compliance reports on fixed deadlines, and routing shortfalls to penalties imposed by an Adjudicating Officer under s.26(3) of the Energy Conservation Act 2001 (p16–17).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Open access, Renewable energy certificates (REC)

Read with this

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document