Central Electricity Regulatory Commission (Power Market) (Second Amendment) Regulations, 2026

Draft amendmentDated 17 Apr 2026No. L-1/257/2020 (PMR-5)/CERC dated 17th April, 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification dated 17 April 2026 proposing the Central Electricity Regulatory Commission (Power Market) (Second Amendment) Regulations, 2026 to the 2021 Power Market Regulations (p1). Its operative provisions would insert definitions, shift price discovery to a Market Coupling Operator and build the framework for market coupling across power exchanges. Commencement is deferred: the amendments take effect only from a date notified separately (p1).

Clause 2 adds definitions of Grid India and the Power Market Coupling Procedure (PMCP), the detailed procedure Grid India is to formulate (p1–2). Clause 3 replaces the price-discovery provision: the MCO is to conduct price discovery from a notified date, with power exchanges continuing until then (p2). Clause 4 substitutes Regulations 38 and 39 to designate Grid India as MCO—requiring a separate cell—and to extend market coupling to DAM, RTM and other segments on segment-specific notified dates (p2–3).

New Regulations 39A–39D set the mechanics: exchanges collect bids in a uniform format and transmit validated anonymous bids to the MCO; the MCO aggregates bids across exchanges; price discovery maximises economic surplus, yields a uniform clearing price, and uses market splitting where transmission congestion occurs (p3). Grid India must formulate the PMCP with Commission approval within six months of the amendment notification, covering roles, timelines, bid format and encryption, algorithm features, scheduling, settlement, operational constraints and MCO charges (p3–4). Regulation 39D applies specified principal regulations to the MCO as they apply to power exchanges (p4).

The note records the 2021 regulations' Gazette publication on 16 June 2021 (p4). The draft leaves key dates—overall commencement, start of MCO price discovery and segment-wise coupling—to later notifications, so it is an enabling framework rather than a self-executing timetable.

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges, Congestion and curtailment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (2)

Proposed changes (drafts with no final yet)

Earlier drafts

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document