Power Market (First Amendment) Regulations, 2025 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Power Market) (First Amendment) Regulations, 2025

Explanatory memorandum to a draftReleased with the notice dated 17 Jun 2025

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Power Market (First Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum for a draft First Amendment to the CERC (Power Market) Regulations, 2021. It is not the amendment itself: it explains why four sets of changes are proposed and then reproduces the proposed amended text clause by clause (p1–13).

Part 1 (p1) records that the Principal Regulations were notified on 15 August 2021 and lists the developments prompting the draft: the 2022 Connectivity and GNA Regulations and their 2023/2024 amendments, the Commission's 28 April 2025 order on contingency-contract price discovery, registration of two OTC platform operators, and the 22 May 2025 draft VPPA guidelines. Part 2 (p1–5) explains each driver. GNA references must replace LTA/MTOA/STOA. The contingency contract definition is to be recast to remove continuous matching. OTC platforms are to move from information exchange to facilitating execution of bilateral contracts without counterparty or credit risk, with stronger oversight. VPPAs are to be recognised as non-transferable specific delivery OTC contracts.

Part 3 (p5–13) sets out the draft amendments: definitions in Regulation 2 (Connectivity and GNA Regulations, Contingency Contract, Designated Consumer, GNA, Market, Member, OTC Market/Platform/Guidelines, VPPA and VPPA Price); the contract types allowed in the OTC market under Regulation 4; replacement of Open Access Regulation references in Regulations 5 and 6; pricing, scheduling and VPPA implementation under Regulation 7; OTC platform objectives (Regulation 41); eligibility net worth (Regulation 43); registration tenure (Regulation 44); obligations and transition net-worth compliance (Regulation 46); Commission intervention (Regulation 50); and inspection, inquiry and audit powers (Regulation 53). The draft amendment is to take effect from Gazette publication; no Gazette date is printed (p5).

Standard name
Power Market Regulations
Primary topics
Power markets and exchanges, Connectivity and GNA, Open access

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (2)

Proposed changes (drafts with no final yet)

Earlier drafts

5 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document